
26
CTC EcoAir 610M / 614M / 622M 400 V 3N~
RJ-12 RJ-45
1. System disconnected from power.
2. Energise the control (EcoLogic or EcoZenith i555 Pro)
as well as the CTC EcoPart 600M which will be numbered
as Heat Pump 2 (VP2).
3. Wait for about 2 minutes.
4. Go to "Installer/Service/Set Address".
Select "Current address", press OK and press the down
arrow until the current heat pump appears (VP1) Press
OK.
Select "New address", press OK and use the arrow to
scroll up and down until the address of the current heat
pump address is shown (VP2). Press OK.
Example of a system with 3 heat pumps.
6.8 Connecting the control
system
6.8.1 Defi ne number of heat pumps
Define the heat pumps in the controlling product’s
display under: "Advanced/Define system/Heat pump".
Set the heat pumps contained in the system to position
"On".
6.8.2 Numbering CTC EcoPart 600M to VP2
Applies to control launched in October 2020
with three connectors on the back of the display.
2 RJ-45 and 1 RJ-12.
!
*CTC EcoZenith i550 Pro
does not control CTC
EcoAir 610M.
HP1
HP1
HP1
HP1
HP1
HP1
Summary of Contents for 588400001
Page 2: ......
Page 32: ...32 CTC EcoAir 610M 614M 622M 400 V 3N 6 9 Wiring diagram 400 V 3N A3...
Page 33: ...33 CTC EcoAir 610M 614M 622M 400 V 3N...
Page 34: ...34 CTC EcoAir 610M 614M 622M 400 V 3N 6 10 Wiring diagram 400 V 3N A4...
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......