CS-iTEC CS 305 Quick Installation Manual Download Page 4

CS 305 

CS 305 

CS 305 English, V1.0 10.01.14 

CS 305 English, V1.0 10.01.14 

0970 0074 

0970 0074 

Connect the power supply cable as indi-
cated in the picture. Please refer to the 
display user guide for the terminal connec-
tions. 

The second cable gland can be used for 
alarm and signal cables. 

After the wiring is done, the CS 305 can 
be closed with 4 screws. 

Use the covers to close the screw open-
ings. 

Connect the compressed air through a 6 
mm hose (we recommend Teflon). 

CS 305 will produce a small compressed 
air bleeding of about 2 l/min. This is re-
quired to have a good response time. 

3. Technical Data 

Wall mountable casing 

Size: 240 x 160 x 105.5 mm 
2 PG inlets, cable size: 4.5 ... 8 mm 
Protection class: IP 65 

Operating temperature 

0 ... 50 ºC 

Transport temperature 

-20 ... 60 ºC 

Weight 

520 g 

For detailed information about the technical data of the display unit and the dew point sensor 
please refer to separate user manuals: 

 

 

- IM_0073_CS 305 (Display unit) 

 

 

- IM_0072_CS 217 (dew point sensor) 

4. Installation 

The instrument is mounted at a wall. Please follow the installation steps as described below.

 

For the wall mounting please first mount the 
brackets to the bottom of the casing as indi-
cated in the picture 

(090) 696-6535 or (093) 820-5599

www.gotek.com.vn

Gotek Vietnam Ltd.

Summary of Contents for CS 305

Page 1: ...n adherence to the instruction manual The warranty is also cancelled once the measuring instrument has been opened provided this is not described in the instruction manual for maintenance purposes Thi...

Page 2: ...pt from liabil ity CS iTEC is not liable for errors which may have slipped into this operating manual CS 305 is designed to meet state of the art safety requirements has been tested and left the facto...

Page 3: ...suring chamber Remove the green terminal connector from the old sensor and connect it to the new sensor 1 Features Dew Point Monitor for refrigerant and desiccant dryers All In One Power supply 100V 2...

Page 4: ...e quired to have a good response time 3 Technical Data Wall mountable casing Size 240 x 160 x 105 5 mm 2 PG inlets cable size 4 5 8 mm Protection class IP 65 Operating temperature 0 50 C Transport tem...

Page 5: ...re quired to have a good response time 3 Technical Data Wall mountable casing Size 240 x 160 x 105 5 mm 2 PG inlets cable size 4 5 8 mm Protection class IP 65 Operating temperature 0 50 C Transport te...

Page 6: ...suring chamber Remove the green terminal connector from the old sensor and connect it to the new sensor 1 Features Dew Point Monitor for refrigerant and desiccant dryers All In One Power supply 100V 2...

Page 7: ...pt from liabil ity CS iTEC is not liable for errors which may have slipped into this operating manual CS 305 is designed to meet state of the art safety requirements has been tested and left the facto...

Page 8: ...n adherence to the instruction manual The warranty is also cancelled once the measuring instrument has been opened provided this is not described in the instruction manual for maintenance purposes Thi...

Reviews: