Appendix A
A-5
7) Remove (3) of the (4) rear post cap bolts and swivel the cap away from the counter weight tank as
shown by loosening the fourth bolt.
8) Install the rear support beam onto the rear post by sliding it vertically (depicted below) while keeping
the mounting hardware loose. Re-install the cap bolts.
Note: Picture does not show counter weight tank.
Summary of Contents for PT415
Page 1: ...PT415 Helium Reliquefier INSTALLATION OPERATION and ROUTINE MAINTENANCE MANUAL...
Page 4: ...1 1 Section 1 Overview...
Page 10: ...2 1 Section 2 Warranty...
Page 13: ...3 1 Section 3 Safety...
Page 20: ...4 1 Section 4 Inspection and Unpacking...
Page 24: ...5 2 Section 5 Specifications...
Page 39: ...Specifications 5 15 Figure 5 8 System I O wiring diagram Internal Supply Local Mode...
Page 40: ...Specifications 5 16 Figure 5 9 System I O wiring diagram Internal Supply Remote Mode...
Page 41: ...Specifications 5 17 Figure 5 10 System I O wiring diagram External Supply Local Mode...
Page 42: ...Specifications 5 18 Figure 5 11 System I O wiring diagram External Supply Remote Mode...
Page 45: ...6 2 Section 6 Installation...
Page 55: ...7 1 Section 7 Operation...
Page 68: ...8 1 Section 8 Routine Maintenance...
Page 77: ...Appendix A A 1 Figure A 1 Reliquefier Main Assembly Drawing...