Inspection and Unpacking
4-1
Section 4: Inspection and Unpacking
IMPORTANT
If there is any visible damage to the packing crates or any components contact Cryomech, Inc.
immediately.
4.1 Inspection of crate
Be sure to note on the shipping documents any visible damage to the crate, including tip
indicators that have been activated.
4.2 Unpacking
The system is shipped in a secure packing crate. The base of the packing crate is a wooden
pallet, to which the system is strapped. The walls of the crate are placed around the system,
attached to the pallet, and to each other with tension clips (Klimp fasteners) and screws.
After adding packing material, the top is clipped onto the packing crate.
4.2.1 Directions for unpacking:
1.
After ensuring there is no visible damage to the packaging, remove the top of the
packing crate by unfastening the Klimp fasteners that join the top to the sides.
2.
Check for tip indicators on the inside and outside of the packing crate.
3.
Check for any visible signs of damage besides activated tip indicators.
4.
Locate and remove items that can easily be lifted out of the crate.
5.
Remove the sides of the packing crate by unfastening the Klimp fasteners and
screws that join the sides to the pallet.
6.
Remove packing material and any straps that anchor items to the pallet. Retain
the packing materials and crate for use in the future, to ship the equipment to
Cryomech, Inc.
7.
Ensure that adequate space is prepared for the equipment (see Section 6 for
installation directions) before continuing.
4.3 Inspection of equipment
4.3.1 Packing list
There is a packing list included with the system. Check that all parts listed on the packing
list are included in the crates. Then, check for any signs of damage to the parts.
4.3.2 Cold head
1.
See weights and dimensions of the cold head in Section 5 to ensure components
can be moved safely.
2.
Inspect the box that contains the cold head for any signs of physical damage.
3.
Remove the screws holding the cover to the box and lift the cover.
4.
Carefully remove packing material to expose the cold head. Retain the packing
material for use in the future, to ship the equipment to Cryomech, Inc.
5.
Use all equipped eyebolts for lifting the cold head. Follow local regulations while
lifting or hoisting the cold head.
6.
Carefully remove the cold head from the box and place on a clean, secure work
surface.
Summary of Contents for CPA289C
Page 1: ...CP PT410 CPA289C C Cryocooler PT410 CPA289C INSTALLATION and OPERATION MANUAL ...
Page 4: ...1 100 D Section 1 Overview ...
Page 7: ...2 100 C Section 2 Warranty ...
Page 10: ...3 100 B Section 3 Safety ...
Page 17: ...4 100 B Section 4 Inspection and Unpacking ...
Page 20: ...05 PT410 CPA289C B Section 5 Specifications ...
Page 31: ...Specifications 5 11 Figure 5 6 System I O wiring diagram ...
Page 32: ...Specifications 5 12 Figure 5 7 System I O wiring diagram external supply ...
Page 33: ...Specifications 5 13 5 4 Cold head drawing Figure 5 8 Cold Head Drawing ...
Page 34: ...6 100 E Section 6 Installation ...
Page 45: ...7 100 C Section 7 Operation ...