![CrucialTrak BACS Quattro Installation & User Manual Download Page 22](http://html1.mh-extra.com/html/crucialtrak/bacs-quattro/bacs-quattro_installation-and-user-manual_2691268022.webp)
© 2017 CrucialTrak Inc. All right reserved.
Page |
21
3.1.1.
Power: Connect DC 12V power supply to the power supply in the "Terminal
Block" on the back of the circuit board. Power Supply 12V / 5A
(max)
is r
ecommended. Make sure to check the direction of ground (GND)
and power supply (VCC). Figure 8 shows the connection for the power.
Figure 8 BACS
TM
Power
3.1.2.
TCP/IP: When using the TCP / IP method, it is possible to construct the access
control system by using this product with LAN method. Connect LAN cable to
the RJ45 connector and connect the other side of the RJ45 cable to this product.
(For the IP setting method, please refer to the guide by asking the product
supplier for the detailed manual.) Figure 9 shows TCP/IP connection.
Figure 9 BACS
TM
TCP/IP Connection