background image

 

 

 

 

Step 4: 

  When the tent is spread evenly proceed to stake down the front and side guy-

lines. Also stake the bottom of the poles once they are in place. Tighten the 
rear guy-lines as required (Fig. 4A) 

  Realign the footprint until it exactly meets the front of the tent and placed 

consistently under the tent (Fig. 4B 

  Use the black aluminium poles to extend the front awning as required. Note, 

when using the front awning utilise the guy-lines at the top of the awning and 
stake them out at an angle from the tent. (Fig. 4C) 

  Open doors/windows as required 

  Run light aluminium pole through sleeves of side awning and secure with 

Velcro fastened receivers. (Fig. 4D)  

 

 

 

 

 

 

Fig. 4A 

Fig. 4C 

Fig. 4D 

Fig. 4B 

Summary of Contents for Loj TT6

Page 1: ...les 3 The outer tent poles Remove the contents from the bags Erect the outer tent first 2 people required Step 1 Lay out the footprint first staking the corners Fig 1A Lay out the outer tent next gree...

Page 2: ...de poles and top poles separate to ease the process Fig 2A Insert poles through sleeves both sides and top and connect only after all have been inserted through the sleeves Do not connect black clips...

Page 3: ...or and flysheet into position before inserting second side of clips Fig 3B Once all the poles are through and clipped stack them on top of each other Fig 3C Stand the tent up vertically and stake at l...

Page 4: ...ets the front of the tent and placed consistently under the tent Fig 4B Use the black aluminium poles to extend the front awning as required Note when using the front awning utilise the guy lines at t...

Page 5: ...nd of the sleeping area Fig 5A Open the front doors of the inner tent as it lays on the ground to allow access to stand during installation Fig 5B Start to clip in inner tent in place but to no more t...

Page 6: ...raps on the top of the outer tent to keep the inner tent poles in place Fig 5F Finish the poles through the eyelets at the top of the inner tent Fig 5G Install separation wall into inner tent if requi...

Page 7: ...emove stakes from side guy lines and base of poles and take down front awning if it was being used Remove carpet and fold One person to each side and remove stakes from front guy lines Walk the front...

Reviews: