
Initial Start-up Procedure for Water Treatment
All Crown Royal Stove purchases are required to purchase authorized water treatment for initial start-up. With each
gallon of treatment, you will be provided with two sample bottles and furnace information forms.
Before adding treatment fill furnace with water and circulate for 48 hrs.
Check for any leaks before adding treatment.
Add initial dosages of treatment for the following models
–
o
RS7200E
–
Add 1 gallon
Follow procedure for collecting water sample below.
Procedure for Collecting Water Sample
Turn off furnace, and circulate for 24 hours to ensure complete mixture of water and treatment.
Collection of sample can be done from drain line or other convenient location.
Allow 30 seconds of drainage before collection of sample.
Use provided 4oz sample bottle to retrieve water sample.
Fill out provided Furnace Information Form and attach to sample bottle.
Mail water sample to designated testing facility found on provided Furnace Information Form.
Testing facility analyzes the conductivity, PH and nitrate levels of water sample.
Testing results are provided on all samples within 4-6 weeks.
If testing results are unsatisfactory, recommendations of additional treatment will be given.
These recommendations will need to be performed and a retest is required to maintain warranty.
o
Low levels
–
Additional treatment is to be added to system and a retest is required.
o
High levels
–
Water will need to be drained and replaced with fresh, untreated water and a retest is
required.
When collecting water samples turn off furnace and allow water to reduce in temperature. When water is reduced to a
safe temperature, collect sample.
WARNING!!! Hot water and surfaces may cause burns. Use extreme care with collection of water sample.
Mailing Samples
–
Testing results are emailed to customers who provide emails on the Furnace Information form or
mailed to the address give, within 4-6 weeks.
It is owner’s responsibility to ensure
you receive testing results and follow
recommendations. When mailing samples to testing facility, it is recommended to mail with tracking capabilities. If test
results are not received within 4-6 weeks, please call 866-361-7355.
Additional Dosage Requirements
If system/furnace experiences a leak or requires water to be added, add treatment at the rate of ½ oz per gallon
of water added.
If furnace system is drained for any reason, refer to initial startup procedure of Water Treatment.
FURNACE TREATMENT PROCEDURE
38
Summary of Contents for RS7200E
Page 2: ......
Page 4: ......
Page 6: ...6...
Page 29: ...ELECTRICAL TROUBLESHOOTING 29...
Page 30: ...ELECTRICAL DIAGRAM 30...
Page 36: ...36...
Page 53: ......