Crown Food Service Equipment DCX-16 Installation & Operation Manual Download Page 9

INSTALLATION AND OPERATION MANUAL, 

DIRECT STEAM CABINET BASE CONVECTION STEAMER, MODEL DCX-16

PART NUMBER 10060R1

9

 2007-02-16

3.0  OPERATING INSTRUCTIONS

 (continued)

SHUT DOWN

1. To shut down cooking compartment, set timers to their OFF position and leave doors

slightly open.

2. At the end of the day, open the door of the cabinet base and turn off the power switch.  Turn

off external steam supply valve.

4.0  PERIODIC MAINTENANCE

 

CAUTION:  Disconnect the power supply during cleaning or
servicing.

CLEANING

1. Keep exposed cleanable areas of unit clean at all times.  

2. Thoroughly wash oven cavities, door liners, and pan racks at the end of each day or as

required with a mild detergent and water to prevent bacterial growth and odours.

3. Remove drain screens from inside compartment drains.  Using a plastic bottle brush and

mild detergent, clean inside the drain opening ensuring there is no food residue or
blockage.  Clean the drain screen and replace in its original position.

4. Wash gasket sealing surface with mild detergent to remove harmful food acids and rinse.

5. Keep all exposed cleanable areas of unit clean at all times.  DO NOT GET WATER IN

ELECTRICAL BOX OR ANY ELECTRICAL COMPONENTS.

5.0  TROUBLESHOOTING

DOOR LEAKS

1. Check for damage to door gasket.

2. Gasket may be adjusted if necessary by turning counter clockwise the screws in the gasket plate.

WATER ACCUMULATES IN THE COMPARTMENT

1. Compartment drain screen clogged, remove and clean thoroughly and then replace.

Summary of Contents for DCX-16

Page 1: ...roughly before installing or servicing this equipment IMPORTANT FOR FUTURE REFERENCE Please complete this information and retain this manual for the life of the equipment Model _______________________...

Page 2: ...lation operation adjustment alteration service or maintenance can cause property damage injury or death Read the installation operating and maintenance instructions thoroughly before installing operat...

Page 3: ...SE CONVECTION STEAMER MODEL DCX 16 PART NUMBER 10060R1 3 2007 02 16 TABLE OF CONTENTS DESCRIPTION PAGE Important Notes 2 1 0 Service Connections 4 2 0 Installation Instructions 5 3 0 Operating Instruc...

Page 4: ...INSTALLATION AND OPERATION MANUAL DIRECT STEAM CABINET BASE CONVECTION STEAMER MODEL DCX 16 PART NUMBER 10060R1 4 2007 02 16 1 0 SERVICE CONNECTIONS...

Page 5: ...ocations marked on floor and insert proper anchoring devices 5 Set unit back in position and re level left to right and front to back 6 Bolt and anchor appliance securely to the floor 7 Seal bolts and...

Page 6: ...lbs of steam per hour to the appliance From the foregoing to use pipe line would most likely prove inadequate An extremely important consideration is the pressure drop that will occur through the ste...

Page 7: ...approximately 32 psi from an original boiler supply of 40 psi It is suggested that wherever possible the steam supply line to the appliance be a separate line from the steam source If the appliance m...

Page 8: ...be cooked into compartment and shut door 2 Set timer to cooking time desired Cooking cycle may be interrupted at any time by opening door and resumed again by closing door 3 When buzzer sounds it ind...

Page 9: ...ch day or as required with a mild detergent and water to prevent bacterial growth and odours 3 Remove drain screens from inside compartment drains Using a plastic bottle brush and mild detergent clean...

Reviews: