![Crown Boiler PHNTM399 Installation And Operating Instructions Manual Download Page 26](http://html1.mh-extra.com/html/crown-boiler/phntm399/phntm399_installation-and-operating-instructions-manual_2690652026.webp)
26
IV. Venting
C. Polypropylene Venting (continued)
NOTICE
The venting system must be free to expand
and contract and supported in accordance
with installation instructions included by the
original polypropylene venting component
manufacturers, M&G/DuraVent or Centrotherm,
whichever applicable. Polypropylene pipe
sections must be disengaged 1/4 to 5/8 in.
(6 mm to 16 mm) per joint to allow for thermal
expansion.
4. Running Flexible Polypropylene Vent
(Liner) Through Unused Chimney Chase
WARNING
Asphyxiation Hazard. Vent systems made by
M&G/DuraVent and Centrotherm Eco Systems
rely on gaskets for proper sealing. When these
vent systems are used, take the following
precautions:
• Make sure that gasket is in position and un-
damaged in the female end of the pipe.
• Make sure that both the male and female
pipes are free of damage prior to assembly.
• Only cut vent pipe as permitted by the
vent manufacturer in accordance with their
instructions. When pipe is cut, cut end
must be square and carefully de-burred prior
to assembly.
• Use locking band clamps at all vent pipe
joints.
Venting of Other Appliances (or Fireplace)
into Chase or Adjacent Flues Prohibited!
Figure 15: Flexible Vent in Masonry Chimney
with Separate Combustion Air Intake
Summary of Contents for PHNTM399
Page 53: ...53 VIII Electrical continued Figure 26 Ladder Diagram...
Page 54: ...54 VIII Electrical continued...
Page 55: ...55 Figure 27 Wiring Connections Diagram VIII Electrical continued...
Page 113: ...113 THIS PAGE LEFT BLANK INTENTIONALLY...
Page 114: ...114 XIII Repair Parts continued PHNTM399 and PHNTM500...
Page 118: ...118...
Page 119: ...119...