![Crown Boiler 24-03 Installation Instructions Manual Download Page 39](http://html1.mh-extra.com/html/crown-boiler/24-03/24-03_installation-instructions-manual_2690573039.webp)
39
Figure 34: Minimum Piping Requirements For Gravity Return Series 24 Steam Boilers
NOTES:
1.
All piping is schedule 40.
2.
To prevent condensate from being trapped in header
, do not reduce
equalizer elbow at header connection. 3.
Ball valve preferable, gate valve acceptable alternative
(supplied by others).
• Minimum valve size per
ASME code is 3/4” NPT
24-03/24-04;
1” NPT
24-05/24-08; 1-1/4” NPT
24-09/24-12.
• Increasing the valve size will improve the blowdown operation.
• In all cases, piping connecting blowof
f valve to boiler shall be full
size to the point of discharge.
4.
Header piping may be run over top of the boiler if space does not
allow for piping arrangement shown. Increased service
requirements will
result however
.
5.
Supply from the boiler header must be connected between the fi
rst
boiler riser and the header drip (or Hartford Loop). Do not connect
supply between risers or opposite end of boiler header
.
Summary of Contents for 24-03
Page 2: ...2...
Page 8: ...8 Section I General Information FIGURE 1 Dimensional Information...
Page 20: ...20 Figure 16 Bare Boiler Assembly...
Page 24: ...24 Figure 22 Series 24 Jacket Assembly Boiler Models 24 03 thru 24 12...
Page 29: ...29 This Page Is Intentionally Left Blank...
Page 45: ...45 Figure 41 Typical Boiler Wiring with RTC Front...
Page 46: ...46 Figure 42 Typical Boiler with RTC Return Sensor Rear...
Page 62: ...62 Figure 44 Bare Boiler Assembly...