Crosswater WLBP3001R Plus Installation Instructions Download Page 3

INSTALLATION
           Remember to turn off the mains water supply before connecting to any 
           existing pipe work.
           Warning! Please check for any hidden pipes and cables before drilling 
           holes in the wall.

!

Position the valve onto the wall and mark the position of the fixing lugs (x4). Make 
sure the valve is set back from the front face of the wall by the appropriate depth 
to allow for plasterboard, filling and tiling etc. (min. 78mm to max. 105mm see 
dimension page).
Mount casting to the wall using suitable fixings.
Always leave access to the four front cartridges for servicing.
Once the valve has been secured to the wall, the black Plastic Dust Cover can be 
temporally attached to the valve with the screws supplied. This will protect the valve 
while the rest of the work is completed 

(see fig 1)

.

Remove Hot and Cold check valves, and flush out the installation, clean the filters 
and refit.
Apply a narrow bead of clear silicone sealant around the back edge of the cover plate 
and carefully press into position.
Fit the control knobs by lining up the flat surface of the valve cover with the grub 
screw on the handle, tighten the screw with the supplied hexagonal key 

(see fig 2)

.

Do not use tapered threaded adaptors or excessive thickness

 

of

 

sealing

 

tape

 

as

 

this

 

may

 

damage

 

the

 

valve

 

body

 

and

 

result

 

in

 

a

 

concealed

 

leak

 

within

 

the

 

wall

 

cavity

 

Blank

 

off

 

and

 

seal

 

the

 

open

 

outlet

 

if

 

it

 

is

 

not

 

required

Remove

 

the

 

Plastic

 

Dust

 

Cover.

Turn

 

on

 

supplies

 

and

 

test

 

all

 

connections

 

for

 

water

 

tightness.

!

Reviews: