![Crosswater MPRO Series Installation Instructions Manual Download Page 2](http://html1.mh-extra.com/html/crosswater/mpro-series/mpro-series_installation-instructions-manual_2689233002.webp)
I
nstallation Instruction
s
PARTS SUPPLIED:
Check to make sure
that
all these parts
are included in
the package:
TOOLS REQUIRED:
• 12” pipe wrench
• 10” adjustable wrench
• Carpente
r’s
l
evel
•
Tape
m
easure
• For wood floor installation:
-
11/64” drill bit for
m
ounting
b
lock
• For concrete/tile installation:
-
11/32” drill bit for
m
ounting
b
lock
MATERIALS REQUIRED:
(Not Included)
• Flexible
s
upply
t
ube/
c
onnector
• Supply
s
top
v
alve
2 -
6
Nut - qty. 2
Washer - qty. 2
Cap - qty. 2
Bolt - qty. 2
Clip - qty. 2
Screw - qty. 2
BEFORE INS
TALLATION:
• Screwdriver
• Putty
k
nife
• Drill
• Pliers
• Mounting (T)
b
olts &
n
uts (2pc)
•
W
ax
r
i
ng/seal
•
Check for any damage that may have occurred during transport.
Note: Damage claims cannot be made
during or after installation.
• Read these instructions thoroughly before beginning work and retain for future reference.
• Please leave instructions for customers.
These instructions contain maintenance and warranty information.
•
Remove the existing toilet. If new construction, purge the supply line.
12
"
In order to fit correctly
, please check the following dimensi
ons:
1) The distance between the finished wall and the center of
the closet flange must be 12”.
W
ater supply should be
approximately 8” to 10” to the l
eft
2) The water supply should be approximately 8” to 10” to
the left (facing the bowl) from the center line of the closet
flange, and approximately 6” above the finished floor.
Supply
Valve
Finished
Wall
12”
C/L
Closet
Flange
Protector sleeve
qty. 2
8" to 10"