![Crestron SmarTouch STS Operation Manual Download Page 11](http://html.mh-extra.com/html/crestron/smartouch-sts/smartouch-sts_operation-manual_2684374011.webp)
Crestron
ST-PK
Programming Kit
Operations Guide - DOC. 5662C
STS Programming Kit: ST-PK
••
7
Preparing the System for Programming
When programming, refer to figure shown below for typical connection diagram for
the SmarTouch STS. Complete the following steps in the order provided to ensure
proper connection of the system.
Typical Connection Diagram when Programming the SmarTouch STS Touchpanel
PROGRAMMING CABLE
ASSEMBLY (15710)
AC POWER
PACK
(CRESTRON
MODEL OR
EQUIVALENT)
PC
CONTROL
SYSTEM
SERIAL
PORT
RJ11 CABLE
ASSEMBLY (15717)
USE ADAPTER
(15556-1B)
TOUCHPANEL
AC POWER PACK
(CRESTRON MODEL
OR EQUIVALENT)
NOTE:
UNITS IN THIS ILLUSTRATION
ARE NOT DRAWN TO SCALE.
NOTE:
The PC to control processor and touchpanel to control processor cables only
need to be attached when programming.
1.
Using the RJ11 cable assembly (15717) and RJ11 to DB9F adapter
(15556-1B) connect the SmarTouch control processor to the RS-232
port on the PC.
2.
Using the programming cable assembly (15710) connect the touchpanel
to the SmarTouch control processor port, labeled NET.
3.
Attach the appropriate external AC power pack to the SmarTouch
control processor and insert plug into outlet.
4.
Apply power to the touchpanel. Consult the appropriate document
listed in “Applying Power” on page 6.
- If the external AC power pack is used, attach it to the touchpanel and
plug into outlet.
- If the ST-DS is used, rest touchpanel in station and plug into outlet.
- If the ST-BTP is used, insert battery pack into battery compartment.