Crestron GLXP-DIMFLV8 Installation Manual Download Page 14

Power Switching 

 

CRESTRON GREEN LIGHT™

 

Appendix A: Setting Module Net IDs 

The following procedure will normally be performed by an authorized Crestron representative as part of the System 
Commissioning phase. For system wiring and basic testing as described on pages 5 and 11, it is not necessary to 
perform this step. Only perform this step if instructed by an authorized Crestron representative, or when replacing 
modules on a system that have already been commissioned (in the latter case the Net ID should be set to match the 
Net ID of the module being replaced). 

The Net ID of each module in the cabinet can be changed from the front panel of each module. The Net IDs of each 
module in the system must be unique.  

To set the Net ID using the front panel: 

1.

 

Press the recessed 

SETUP

 button to enter the 

Setup

 mode. The 

SETUP

 LED illuminates. 

2.

 

As shown in the following diagram, press the left button under the 

NET ID

 display to change the left digit 

of the Net ID or press the right button under the 

NET ID

 display to change the right digit of the Net ID 

number.  

Changing the Net ID 

 

 

3.

 

When the desired Net ID is displayed, press the 

SETUP

 button to exit the 

Setup

 mode. The 

SETUP

 LED 

extinguishes.  
 
If the 

SETUP

 button is not pressed, the 

Setup

 mode will time out after one minute activity and the Net ID 

will revert back to its original value. 

14  

  CRESTRON GREEN LIGHT Power Switching 

Installation Guide – DOC. 6672B 

Summary of Contents for GLXP-DIMFLV8

Page 1: ...ards and requirements by Underwriters Laboratories Inc E227280 cabinet and E103692 modules Application The following diagram shows CRESTRON GREEN LIGHT cabinets in a lighting application that is contr...

Page 2: ...L FOR 3 4 19 mm 1 2 13 mm CONDUIT TYPICAL TOP BOTTOM 6 5 8 169 mm H1 H3 H2 20 508 mm OPTIONAL DOOR 5 16 8 mm 2 1 2 64 mm 15 381 mm 5 8 16 mm 7 16 12 mm External Dimensions of CRESTRON GREEN LIGHT Powe...

Page 3: ...8 mm 6 1 4 159 mm 2 51 mm 2 51 mm 8 204 mm 3 7 8 99 mm Interior Dimensions of CRESTRON GREEN LIGHT Cabinets 120 Service 277 Service DIMENSION 12 Breaker 30 Breaker 42 Breaker 12 Breaker 30 Breaker 42...

Page 4: ...net is designed for surface mounting on a wall Cabinets are intended for indoor use only The ambient temperature range should be 32 F to 104 F 0 C to 40 C The relative humidity should range from 10 to...

Page 5: ...prewired to the branch circuit breakers The following must be performed after installation Connect incoming feed conductors to the breaker panel section A of the following diagram Connect load wiring...

Page 6: ...G AL 6 300 kcmil CU or AL 15 lb ft 20 3 Nm 21 lb ft 28 5 Nm 6 350 kcmil CU or AL 1 0 750 kcmil CU or AL 275 300 lb in 31 1 33 9 Nm Neutral Bus 14 10 AWG CU or 12 10 AWG AL 8 AWG CU or AL 6 4 AWG CU or...

Page 7: ...DIMFLV8 only 28 12 AWG 4 43 lb in 0 5 Nm 5 16 8 mm GROUND BAR 14 10 AWG 35 lb in 4 0 Nm 5 16 8 mm GROUND LUG 14 4 AWG 45 25 lb in 5 1 2 8 Nm 3 4 19 mm 1 Each output has a label with the number of the...

Page 8: ...all jumpers 4 Turn on the circuit breakers Control Wiring Section C The bottom of the cabinet contains Cresnet connections for interfacing to the rest of the Crestron control system It also provides...

Page 9: ...using improper wire When daisy chaining connections between NET ports strip the ends of the wires carefully to avoid nicking the conductors Twist together the ends of the wires that share a pin on th...

Page 10: ...ed and receiving 24 VDC power externally the green LED next to the MODULES port will light When a lighting module is powered from a Cresnet power supply in the absence of line power the module s PWR L...

Page 11: ...tem program may change the settings if the Override mode is not enabled Override Mode The Override mode overrides the control system program and sets all of the output states to the stored override va...

Page 12: ...Crestron system System commissioning by an authorized Crestron representative must be performed to ensure system operation Once the cabinet has been wired and the modules have been tested contact Cre...

Page 13: ...sure exists between G and OVR terminals on any of the OVERRIDE terminals present at bottom of the cabinet Determine the reason for the short Remove or remedy the short e g GLS PLS 120 277 phase loss s...

Page 14: ...t can be changed from the front panel of each module The Net IDs of each module in the system must be unique To set the Net ID using the front panel 1 Press the recessed SETUP button to enter the Setu...

Page 15: ...c Low Voltage Electronic Low Voltage Neon Cold Cathode Fluorescent Ballast HID Motor Dimmable Loads 0 10 VDC dimmable fluorescent ballasts i e Advance Mark 7 or other ballasts that comply with the spe...

Page 16: ...ays batteries and incandescent lamps are not covered This warranty extends to products purchased directly from CRESTRON or an authorized CRESTRON dealer Purchasers should inquire of the dealer regardi...

Reviews: