Crestron C2NI-AG
Creslight II Keypad C2NI-AG
• Operations & Installations Guide - DOC. 6xxx
14
Cresnet Connections
Connect the C2NI-AG to the Cresnet Network via a Cresnet network cable (CRESNET cable). This cable is
not supplied with the C2NI-AG but can be obtained from Crestron.
• Do not power up system until all wiring is verified. Care should be taken to ensure Data (Y & Z), and
Power (24 & G) connections are not crossed.
• Ground Shield at the Control System end only.
• Model DIN-BLOCK network terminal expander and diagnostic tool for the Cresnet system is recom-
mended for testing purposes and wiring convenience.
• Jumper wires: Use #18 AWG. Use a wire nut that accommodates all three wires