![Cree FLEX Series Commercial Specification Download Page 2](http://html.mh-extra.com/html/cree/flex-series/flex-series_commercial-specification_2682419002.webp)
2 of 4
LPN00611X0001A1_C
3
Power Supply
Junction Box Cover
TO INSTALL:
T- BAR CEILING MOUNTING
STEP 1:
Bring the FLEX troffer up into
the T-Bar grid.
STEP 2:
Locate the luminaire hooks and
bend them out 90 degrees for
installation. See
Figure 1.
NOTE:
The luminaire hooks ship
bent in and need to be bent out
for installation.
STEP 3:
Then bend the luminaire hooks
against the T-Bar to secure the
luminaire. See
Figure 1.
SUSPENDED MOUNTING
STEP 1:
Attach customer supplied
cables to the (2) cable slots on
each side of the housing. See
Figure 2.
STEP 2:
Attach customer supplied
cables to mounting surface
using customer supplied
hardware. Ensuring that
mounting surface can support
the luminaire.
STEP 3:
Attach the RF Module to the
luminaire by clicking it into
place as Shown in
Figure 3.
2
Cable Slots
RF Module
1
Luminaire Hooks
T-bar
1st:
90°
Bend
2nd:
Bend
Against T-bar
T-bar