Cree FLEX Series Commercial Specification Download Page 2

2 of 4

LPN00611X0001A1_C

3

Power Supply

Junction Box Cover

TO INSTALL:

T- BAR CEILING MOUNTING 

STEP 1:

Bring the FLEX troffer up into 
the T-Bar grid. 

STEP 2:

Locate the luminaire hooks and 
bend them out 90 degrees for 
installation. See 

Figure 1.

NOTE: 

The luminaire hooks ship 

bent in and need to be bent out 
for installation.

STEP 3:

Then bend the luminaire hooks 
against the T-Bar to secure the 
luminaire. See 

Figure 1.

SUSPENDED MOUNTING

STEP 1:

Attach customer supplied 
cables to the (2) cable slots on 
each side of the housing. See 

Figure 2. 

STEP 2:

Attach customer supplied 
cables to mounting surface 
using customer supplied 
hardware. Ensuring that 
mounting surface can support 
the luminaire.

STEP 3:

Attach the RF Module to the 
luminaire by clicking it into 
place as Shown in

 Figure 3.

 

2

Cable Slots

RF Module

1

Luminaire Hooks

T-bar

1st:  

90°

 

 Bend

2nd: 

Bend 

Against T-bar

T-bar

Summary of Contents for FLEX Series

Page 1: ...tor of the emergency driver before servicing Pour réduire le risque de décharge électrique vous devez déconnecter à la fois le disjoncteur divisionnaire ou les fusibles et les alimentations d urgence avant l entretien 4 Do not use outdoors Ne pas utiliser à l extérieur 5 Do not let power supply cords touch hot surfaces Ne laissez pas les cordons d alimentation toucher les surfaces chaudes 6 Do not...

Page 2: ... bend the luminaire hooks against the T Bar to secure the luminaire See Figure 1 SUSPENDED MOUNTING STEP 1 Attach customer supplied cables to the 2 cable slots on each side of the housing See Figure 2 STEP 2 Attach customer supplied cables to mounting surface using customer supplied hardware Ensuring that mounting surface can support the luminaire STEP 3 Attach the RF Module to the luminaire by cl...

Page 3: ...witch assembly by screwing the small trim ring removed in Step 5 back onto the test switch assembly Tighten the larger trim ring above the ceiling until it is snugged tight against the ceiling See Figure 5 CLEANING LENS STEP 1 Remove lens and end cap assembly by pulling straight downward gently See Figure 6 STEP 3 After cleaning is complete insert lens and end cap assembly back into the luminaire ...

Page 4: ...e checked periodically to ensure that it is working The following schedule is recommended Visually inspect the charging indicator light monthly It should be illuminated Test the emergency operation of the fixture at 30 day intervals for a minimum of 30 seconds When the test switch is depressed the LED array should operate Conduct a 90 minute discharge test once a year The LED array should operate ...