background image

Building instructions Crossover L

Page 15

www.creativestructures.nl

S

tep 13:

Mount the second end of the 8 remaining main cables cables 

Summary of Contents for Crossover L

Page 1: ...www creativestructures nl Building instructions Crossover L Version 2 1 ...

Page 2: ...re assemble the lower sub profiles 4x Step 1 Locking pin Short version CS 0105 2x Securing ring CS 0248 2x Lower short sub profile CS 0055 T Connector Lower Right Marked with LR CS 0057 T Connector Lower Left Marked with LL CS 0052 LL LR Curvature has to point downwards ...

Page 3: ...re assemble the upper sub profiles 4x Step 2 Upper long sub profile CS 0054 T Connector Upper Right Marked with UR CS 0056 T Connector Upper Left Marked with UL CS 0051 UL UR Locking pin Short version CS 0105 2x Securing ring CS 0248 2x Curvature has to point downwards ...

Page 4: ...3 www creativestructures nl Pre assemble the sub frame Step 3 Sub frame center CS 0334 Secure all parts with locking pins short version and securing rings Joint has to point downwards Sub frame beam CS 0335 4x Sub frame connector CS 0336 4x ...

Page 5: ...creativestructures nl Assemble frame body Step 4 Secure all parts with locking pins long version and securing rings Main profile CS 0049 X connector CS 0050 X connector CS 0050 Hooks have to point inwards Main profile CS 0049 Main profile CS 0049 ...

Page 6: ...Building instructions Crossover L Page 5 www creativestructures nl Secure all parts with locking pins long version and securing rings Main profile CS 0049 X connector CS 0050 X connector CS 0050 ...

Page 7: ...Building instructions Crossover L Page 6 www creativestructures nl Mount sub frame at frame body Step 5 Locking strip CS 0337 4x Securing ring CS 0248 4x ...

Page 8: ...ure is designed for two lifting methods 1 Lifting from below for example with a traverse lift by using the subframe Requirements lifting device minimum lifting height 6 meter minimum save working load 300kg 2 Lifting from above for example with a crane by using lifting slings 2 meter 1000 KG and the hooks of the X connectors Lifting Note this lifting methode requires more height for building ...

Page 9: ...Building instructions Crossover L Page 8 www creativestructures nl Mount the first end of the main cables Step 6 Main cable 4x per X connector CS 0086 ...

Page 10: ...uilding instructions Crossover L Page 9 www creativestructures nl Step 7 Mount the first level of main profiles Main profile CS 0049 8x Secure all parts with locking pins long version and securing rings ...

Page 11: ...structions Crossover L Page 10 www creativestructures nl Step 8 Mount the upper sub profiles 4x Secure all parts with locking pins long version and securing rings UL UR Curvature sub profiles has to point inwards ...

Page 12: ...Building instructions Crossover L Page 11 www creativestructures nl Step 9 Mount the second end of the 8 inner main cables ...

Page 13: ...Building instructions Crossover L Page 12 www creativestructures nl Step 10 Mount the first end of the tensioning cables Tensioning cable CS 0234 8x ...

Page 14: ...ilding instructions Crossover L Page 13 www creativestructures nl Step 11 Mount the second level of main profiles Secure all parts with locking pins long version and securing rings Main profile CS 0049 8x ...

Page 15: ...structions Crossover L Page 14 www creativestructures nl Step 12 Mount the lower sub profiles 4x Secure all parts with locking pins long version and securing rings LL LR Curvature sub profiles has to point inwards ...

Page 16: ...Building instructions Crossover L Page 15 www creativestructures nl Step 13 Mount the second end of the 8 remaining main cables cables ...

Page 17: ...uilding instructions Crossover L Page 16 www creativestructures nl Step 14 Mount the last level of main profiles Secure all parts with locking pins long version and securing rings Main profile CS 0049 8x ...

Page 18: ...tructures nl Step 15 Mount the feet 4x Secure all parts with locking pins long version and securing rings Foot connector Left CS 0058 Foot connector Right CS 0108 Anchor slide CS 0099 Anchor support CS 0148 Hooks have to point to the inside of the structure ...

Page 19: ...positioning cables Positioning cable CS 0235 4x The positioning cables are used to secure an acurate distance between the feet After mounting the positioning cables the structure can be placed on its feet Pull the legs of the structure outwards to put the positioning cables under tension ...

Page 20: ...l Step 17 Anchor the structure For the different anchoring options and instructions see the anchoring guide After anchoring the positioning cables can be removed In stormy conditions the positioning cables have to be mounted to provide extra stability to the structure ...

Page 21: ...r L Page 20 www creativestructures nl Step 18 Mount and tension the 8 tension cables By tensioning the tension cables all the cables in the structure get tensioned and the structure gets its rigidity Use the inner hooks of the feet ...

Page 22: ...nl Step 19 Place the cover over the structure The included rope can be used to pull the cover over the structure Do not place the cover in windy conditions or take decent security measures Step 20 Place the pull bars in the loops of the cover corners Pull bar CS 0497 ...

Page 23: ...Building instructions Crossover L Page 22 www creativestructures nl Step 21 Tension the cover at the corners Use the the seams of the cover to align the cover with the structure Ratchet plate CS 0236 ...

Page 24: ...Building instructions Crossover L Page 23 www creativestructures nl Step 22 Tension the contours of the cover with the turn buckles Turn buckle 8x ...

Page 25: ...nside of the structure The 5 hooks now can be demounted 3 Tension the side panel with the lashings at the bottom Tension the outer lashings to the structure feet and the inner lashings to the ground Inside For the different anchoring options and instructions see the anchoring guide Side panel CS 0402 Step 24 Mount the connection gutter if desired Close the zippers from right to left seen from the ...

Reviews: