pg 12 of 17
REF: ZM104 - FORT LINCOLN
Attach the CLATTERBRIDGE to the TIMBERS WO103d/e/f/g and
Metal Floors
Using 12x NYLOCS / 12x Covered end cap
Attach the the TIMBERS WO103j to WO103d/e/f/g TIMBERS
Using 12x FM80 Brass Screws / 8x FM120 Brass Screws
10
11
Installation Instructions
e
e
f
g
j
j
d
f
g
d
(CLATTERBRIDGE )
212mm
THREAD BAR
212mm
THREAD BAR