Assembly Instructions
REF: CH142 - DOME MOUND TUNNEL
pg 8 of 13
5
Build up the MOUND using the 25kg bags of ballast
NOTE:
THE HATCHED AREA shows APPROXIMATELY how the
bags (cement and ballast) should be mounded
Dimensions are taken from GROUND level in the centre
to the FRONT EDGE of the FRAME
NOTE:
BAGS can be placed in
the ‘GAPS’ in the FRAME
ENSURE:
BAGS MUST be placed
under the TUBE SECTION