pg 8 of 15
REF: AC103 - CLYDE ACTIVITY CENTRE
Attach the TIMBERS AC101o to the TIMBERS AC101b/c and
AC103b/c
Using 4x @200mm M12 SQUARE CUP HEX BOLTS / 4x NYLOCS / 4x RED CAPS
Attach the timbers AC101m/k to the TIMBERS AC103b/c
Using 6x @200mm M12 SQUARE CUP HEX BOLTS / 6x NYLOCS / 6x RED CAPS
3
4
Installation Instructions
o
b
b
c
d
b
c
d
b
c
c
AC101
AC101
AC101
AC101
AC101
m
k
k
AC101
AC101
AC101
Summary of Contents for CLYDE ACTIVITY CENTRE AC103
Page 1: ...CLYDE ACTIVITY CENTRE Installation Instructions REF AC103 CLYDE ACTIVITY CENTRE pg 1 of 15...
Page 4: ...pg 4 of 15 REF AC103 CLYDE ACTIVITY CENTRE TOOLS required TOOLS required NOTES...
Page 6: ...pg 6 of 15 REF AC103 CLYDE ACTIVITY CENTRE MINIMUM SPACE SURFACE AREA Surfacing Details...
Page 15: ...pg 15 of 15 REF AC103 CLYDE ACTIVITY CENTRE Additional Dimensions...