pg 12 of 15
REF: AC103 - CLYDE ACTIVITY CENTRE
Installation Instructions
Attach the CLATTERBRIDGE to the EYEBOLTS , METAL
FLOOR and to the TIMBERS AC101b and AC103b/c
Using (2x @80mm) (2x @130mm) M12 EYEBOLT/ 6x NYLOCS / 6x RED CAPS / 4 QUICKLINKS
A
10
A
A
A
A
B
b
b
c
b
AC101
AC101
Attach the RAMP ROPE to the ramp and AC103f
Using 2x NYLOCS / 2x RED CAPS
11
19
f
Summary of Contents for CLYDE ACTIVITY CENTRE AC103
Page 1: ...CLYDE ACTIVITY CENTRE Installation Instructions REF AC103 CLYDE ACTIVITY CENTRE pg 1 of 15...
Page 4: ...pg 4 of 15 REF AC103 CLYDE ACTIVITY CENTRE TOOLS required TOOLS required NOTES...
Page 6: ...pg 6 of 15 REF AC103 CLYDE ACTIVITY CENTRE MINIMUM SPACE SURFACE AREA Surfacing Details...
Page 15: ...pg 15 of 15 REF AC103 CLYDE ACTIVITY CENTRE Additional Dimensions...