5
6
Assembly Instructions
REF: CH136 - TIMBER CRAWL TUNNEL
pg 7 of 9
Attach ‘T3 timber - 6 hole’
to the support ring
Using torktainers
torktainer
torktainer nut
support ring
T3 Timber-6 hole
Bolt the ‘T3 timber - 6 holes’to the TCT2 timbers
Using M12 130 cup square hex
REVISED 05.02.13 - T3 & T4 timber slats OVERHANG
the METAL RING 10mm