16
Preventive Maintenance Schedule
Starting and adhering to a comprehensive preventive maintenance program will ensure and extend the trouble-
free operation of your baler. Particular attention should be given to the maintenance of the hydraulic system to ex-
tend the life of the baler.
Daily
Clean any loose material from the top of the presshead.
Clean any loose material from the tie slots in the floor of the bale chamber and underneath the dump tray after
dumping each bale. Follow Lock out / Tag out procedures and Presshead Chocking procedures as specified
elsewhere in this manual.
Clean the surface of the magnetic door latch and striker with a clean cloth.
Monthly
Lubricate the chamber door hinges.
Lubricate dump handle bushings.
Grease the turnbuckle for the chamber door latch.
Check the oil level with the presshead fully raised.
Check all hydraulic hoses for rubbing, chafing, deterioration, damage, and leaks.
Check all hydraulic fittings for loosening and leaks.
Check that all safety decals are present and legible.
Annually
We recommend having a
CRAM-A-LOT
®
Factory Authorized Service Technician perform the annual preventive mainte-
nance check. To coordinate a PM Check through
CRAM-A-LOT
®
Customer Support, call 1-800-754-4290.
Replace the hydraulic oil.
Check presshead guides for wear and adjust appropriately.
Check the cylinder mounting bolts for tightness.
Date
Performed By
Maintenance Interval Performed
1/1/03
Joe Fixit
Monthly
Annual
Monthly
Annual
Monthly
Annual
Monthly
Annual
Monthly
Annual
Monthly
Annual
Monthly
Annual
Monthly
Annual
Monthly
Annual
Monthly
Annual
Monthly
Annual
Monthly
Annual
Monthly
Annual
Monthly
Annual
Preventive Maintenance History
Maintenance, cont.
Summary of Contents for VB-42-B
Page 2: ...2 ...
Page 4: ...4 ...
Page 23: ...23 Parts Diagrams 4 9 8 7 6 12 14 16 1 2 3 10 11 13 15 5 Chassis Loading Door Fig 9 ...
Page 28: ...28 Electrical Schematic Fig 13 ...
Page 29: ...29 Hydraulic Schematics ...