![Craftsman 117.205710 Operator'S Manual Download Page 10](http://html.mh-extra.com/html/craftsman/117-205710/117-205710_operators-manual_73721010.webp)
OM-194 199 Page 7
2-5.
Installing Work Clamp
1
Work Cable
2
Boot
Slide boot onto work cable. Route
cable out front panel opening from
inside.
3
Negative (–) Output Terminal
Connect cable to terminal and
cover connection with boot.
4
Hardware
5
Work Clamp
Route cable through clamp handle
and secure as shown.
Close door.
ST-801 566-A
1/2, 3/4 in
1
2
3
4
5
Tools Needed:
2-6.
Installing Gas Supply
ST-801 571 / ST-802 028
Obtain gas cylinder and chain to
running gear, wall, or other station-
ary support so cylinder cannot fall
and break off valve.
1
Cap
2
Cylinder Valve
Remove cap, stand to side of valve,
and open valve slightly. Gas flow
blows dust and dirt from valve.
Close valve.
3
Cylinder
4
Regulator/Flowmeter
Install so face is vertical.
5
Regulator/Flowmeter Gas
Hose Connection
6
Welding Power Source Gas
Hose Connection
Connect customer supplied gas
hose between regulator/flowmeter
gas hose connection, and fitting on
rear of welding power source.
7
Flow Adjust
Typical flow rate is 20 cfh (cubic feet
per hour). Check wire manufactur-
er’s recommended flow rate.
8
CO
2
Adapter (Customer Sup-
plied)
9
O-Ring (Customer Supplied)
Install adapter with O-ring between
regulator/flowmeter and CO
2
cylinder.
6
5/8, 1-1/8 in
Tools Needed:
CO
2
Gas
8
9
3
1
2
4
5
7
1
2
3
Argon Gas
OR
Summary of Contents for 117.205710
Page 22: ...OM 194 199 Page 19 SECTION 5 ELECTRICAL DIAGRAM SB 186 065 Figure 5 1 Circuit Diagram ...
Page 38: ...OM 194 199 Page 35 Notes ...
Page 66: ...OM 194 199 Página 63 Apuntes ...
Page 67: ...OM 194 199 Página 64 ...
Page 68: ......