
11
OPERATION
S
Replacement of Chuck
The head spindle holding fixture is cylindrical. Loose
n
three set screws and nuts (A, Fig.17, only two are
shown) on the lathe chuck flange to remove the chuck.
Position the new chuck and fix it using the same set
screws and nuts.
Tool Set-Up
Clamp the turning tool into the toolholder.
The tool must be clamped firmly. When turning, the
tool has a tendency to bend under the cutting force
generated during the chip formation. For best results,
tool overhang should be kept to a minimum of 3/8” or
less.
The cutting angle is correct when the cutting edge is in
line with the center axis of the work piece.
The proper
alignment of the cutting tool can be achieved by using
shims. For proper positioning reference the tool tip to
point of center
mounted in the tailstock. If necessary,
use steel spacer shims under
the tool to get th
e
required height. (Fig. 18)
Change H/L Speed
1. Unscrew the two fastening
knobs
(B, Fig.19) and
remove the protective cover.
2.
Position the belt on the pulley as
indicated
in the feed chart.
A
is low speed, B is high speed. (Fig. 20)
Caution:
:
e suggest
RXUFXVWRPHUV
to select
ORZVSHHG
DVLW
provides
LPSURYHG
torque!
Belt Adjust
ment
Loosen the four nuts and screws (C, Fig. 20)
.
Reposition the motor mounting plate to increase or
decrease the tension on the belt.
Fig. 17
Fig. 18
Fig. 19
C
Fig. 20
B
Summary of Contents for CX706
Page 1: ......
Page 4: ...2 ...
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 16: ......
Page 17: ...w o r k p i e c e w o r k p i e c e ...
Page 22: ......
Page 25: ... ...
Page 27: ...2 5 ...
Page 29: ...2 7 ...
Page 32: ... SURQ VVHPEO ...
Page 35: ...3 3 ...
Page 38: ...3 CX706 Electrical Box Assembly ...
Page 40: ...3 8 ...
Page 42: ......