Super Shot 125 Diesel Melter Part Manual
Chapter 5 Operating Instructions
©2017 by Crafco, Inc. All Rights Reserved………………..…………………………………..….Operating Instructions 5-14
5.12 Shutting Down and Cleaning Out the Machine (47400)
Step
Action
CAUTION
When shutting down the machine for the day, Crafco recommends leaving the
melter about half full with material. This will give a fairly rapid heat up rate in the
morning, but allows enough material to start dispensing right away when the
material becomes molten.
1
Leaving the hose in the boom, swing the boom clockwise towards the front of the
machine and lock the boom into position with the latch provided.
CAUTION
DO NOT kink or twist the hose or permanent damage may result.
2
Place the wand in the wand holder and lock the wand into position with the latch
provided.
3
Place the hose in the hose guide and secure with the Velcro strap.
4
Reverse the pump approximately 30 more seconds.
5
Turn the mixer toggle switch to the “CENTER” position.
6
Turn the “BURNER” switch to the “OFF” position.
7
Stop the engine by pressing the “OFF” button on the engine controller. The engine
will go into a “IDLE COOL” for ten seconds and then the engine will shut down and
stop.
8
Turn off all power in the control box by turning the key to the “OFF” position.
Table 5-11 Shutting Down and Cleaning Out the Machine (47400)
Summary of Contents for SUPER SHOT 125
Page 1: ...Parts Manual 26631 Revision D SUPER SHOT 125 DIESEL MELTER ALL MODELS...
Page 20: ......
Page 24: ......
Page 28: ......
Page 64: ......
Page 68: ......
Page 224: ......
Page 228: ......
Page 229: ......
Page 230: ...2017 Crafco Inc...