23
After hanging, push the enclosure to the right to its final position
(
Figure 3-13
) and secure with M6x18 combination screw (torque:
6Nm (53 in-lbs)).
Figure 3-13 The main Enclosure Position
(4)
Install the wire box.
Tools required: No. 2 Phillips head screwdriver,
13mm hex head wrench.
A.
Remove the connector cover on the left of the wire box, Save the
cover and screws (see
Figure 3-14
).
Figure 3-14 Wire Box Cover
Summary of Contents for SCH100KTL-DO-480
Page 2: ......
Page 4: ......
Page 43: ...39 Figure 3 25 AC Output Cable Connection Distributed Wire box L1 L2 L3 ...
Page 45: ...41 Figure 3 27 AC Output Cable Connection Centralized Wire box Ver 2 ...
Page 58: ...54 Figure 4 1 System setting ...
Page 81: ...77 5 4 2 6 Others The REF column is reference to Table 5 7 Enable functions ...