background image

English

84508-B

COZY HEATING SYSTEMS, LLC

PHONE: 502-589-5380

3230 INDUSTRIAL PARKWAY.

JEFFERSONVILLE, IN 47130

FSK-A:  INSTALLATION INSTRUCTIONS

STEP 1

  a.  Attach both lower side panels (40410 / 

40422) to floor plate (40405) with 4 No. 

8x3/8 screws.

 b. Attach header·plate (provided with 

unit - not FSK Kit) to lower side panel 

brackets with 4 No. 8x3/8 hex head 

screws.

  c.  Cut wall baseboard to fit tight against 

side panels, stand enclosure against 

wall and fasten securely with screws 

or lag bolts (

not provided

). Use a level 

to assure vertical plumb and fasten the 

floor plate to the floor.

  d.  Measure distance between ceiling and 

center of holes near top of lower side 

panels. Add ½" to this dimension to 

determine how much metal is to be cut 

from each top side panel (40415/40416) 

and front panel (40418).

 d.  Attach front panel (40418) using 12 

No. 8x3/8 screws. 

 e. 

 

Connect gas line to heater in 

accordance with local codes.

 f.  Attach unit to header plate plaster 

ground. Secure to heater using (1) No. 

8xl-l/2 screw. Secure at bottom using 

(2) No. 10x1/2 screws with washers.

Fig. 6

4

6

STEP 3

 a. Attach leg locating brackets to 

legs with mounting· tabs facing 

each other. Secure with four (4) 

 

10-24 x 1/2 bolts w/nut and washer. 

See Fig. 5-A

 b.  Set furnace body into position, 

fastening the brackets to the floor 

plate using 4 No. 10-24x1/2 bolts 

with nuts.

  c.  Attach upper side panels (40415 I 

40416) to top of lower side panels 

with 4 No. 8x3/8 screws. Use a level 

to assure vertical plumb, then attach 

upper side panels to wall with 8 No. 

8x3/4 screws.

3

2

1

Fig. 5-A

Fig. 5

Fig. 1

40415

40416

84901

40405

40422

4⅜”

4⅜”

40418

16½”

36”

36”

69¼”

40410

STEP 2

 a.  After locating position of enclosure 

cut a 3-1/2 inch x 14 inch opening  

between ceiling joists. 

See Fig. 2

 b. Install (1) ceiling plate spacer 

(P/N 84901) to back wall, center in 

enclosure. 

See Fig. 3

 c. Install Type BW Vent through the 

roof and studs in accordance· with 

local codes. Attach vent with base 

plate to header plate.

 d.  Install gas inlet through back wall 

or one of two holes in floor plate 

(40405). 

See Fig. 4

Stud Wall

Centered

3½”

14”

Fig. 2

Fig. 3

Ceiling Plate Spacer

B/W Vent Pipe

Fig. 4

Gas Stub Locations

Stud Wall

Summary of Contents for FSK-A

Page 1: ... Máxima del Techo MODELO FSK A MODEL FSK A INSTRUCCIONES DE INSTALACIÓN KIT DE PIE LIBRE Y HORNO DE PARED SIMPLE NOTICE D INSTALLATION KIT DE RANGEMENT LIBRE ET FOUR MURAL SIMPLE MODEL FSK A Install only on 8 8 5 Max Ceiling Height Installation Instructions Free Standing Kit Single Wall Furnace ...

Page 2: ...er using 1 No 8xl l 2 screw Secure at bottom using 2 No 10x1 2 screws with washers Fig 6 4 6 STEP 3 a Attach leg locating brackets to legs with mounting tabs facing each other Secure with four 4 10 24 x 1 2 bolts w nut and washer See Fig 5 A b Set furnace body into position fastening the brackets to the floor plate using 4 No 10 24x1 2 bolts with nuts c Attach upper side panels 40415 I 40416 to to...

Page 3: ... con el kit FSK A a los soportes del panel lateral inferior con 4 tornillos de cabeza hexagonal N 8x c Corte el zócalo de la pared para que quepa adjustado contra los paneles laterales pare el cerramiento contra la pared y fije en fonna segura utilizando tomillos o pernos de fijación no proporcionados Utilice un nivel para asegurarse que esté a plomo vertical y fije la placa de piso al piso d Mida...

Page 4: ...1 Maintenir le bas avec 2 vis N 10x et rondelles Fig 6 4 6 ÉTAPE 3 a Installer les suppotis de mise en place sur les pattes avec les languettes de montage se faisant face Sécurisé avec quatre 4 10 24 x boulons w écrou et rondelle Voir la Figure 5 A b Mettre le corps de l appareil de chauffage en position attacher les suppotts sur la plaque du sol avec 4 boulons et écrous N 10 24 x c Attacher les p...

Reviews: