background image

   Cox systems are shipped “ready to use”. All           

            Employ qualified, experienced installers, to  

necessary standard equipment, controls, and wiring    

       insure the safe and efficient operation of your 

are packaged with the heating systems.                       

       heating system. 

   Use the supplied furnace 

and

 burner manual,  

together, to install the system. 

 
 

 
PACKING PROCEDURE…………2                                     SEQUENCE OF OPERATION…….. 8 
 
FURNACE ASSEMBLY                                                         MAINTENANCE………………….. 9 
DRAWINGS ….………………….. 3                                    

 

 

 

 

 

 

 

            WIRING DIAGRAM……………….10 

FURNACE SPECIFICATIONS..…4 

                               

                                                                                                   MISCELLANEOUS……………….. 11 
CLEARANCES……………………5                                        A. FILTER RACK ……………….. 11                                               

 

B. DRAFT HOOD ……………….. 11 

INSTALLATION INSTRUCTIONS 

 

 

C. OIL BURNER BLAST TUBE 

A. GENERAL ...………………….. 5                                              LOCATION  ………………….11 
B. 

FLUE………...…………………5 

  D. 

BLEEDER 

TUBE 

…………….. 

12 

C. COMBUSTION AIR 
     SUPPLY ……………………… 6 
D. BLOWER ADJUSTMENT…… 6 
E. BURNER INSTALLATION….  7 
 

 

 

 

 

 

 

 

 

                                                            

PACKING 

 

1 – Package -                                                                                     1 – Package- 

   Prewired and tested furnace assembly:                                              Gas or oil burner: 
   1- Heat exchanger/combustion chamber and               

 

1- Oil or gas burner and controls 

        casing                                                                              

 

1- Oil nozzle 

   1- Blower and pulley                                                       

 

1- Instruction manual and literature 

   1- Motor and pulley                                                           

 

1- Gas burner mounting flange 

   1- Belt (2 on dual drives)                                                                  

1- Instruction envelope and (2) wiring diagrams 
1- Fan limit installed                                                                       

1 – Package-

 

1- Oil burner mounting flange                                             

 

Draft control or draft hood  

 

NOTE: Actual packing may vary according to sizes, weights, models, custom jobs, etc. Optional 
equipment may or may not be packed separately. 
 

FOR YOUR SAFETY                                        FOR YOUR SAFETY 

If you smell gas:                                                      

 

Do not store or use gasoline  

1.

 

Open windows  

 

or other flammable vapors 

2.     Don’t touch electrical  switches  

 

and liquids in the vicinity of 

3.     Extinguish any open flame  

 

this or any other appliance. 

4.     Immediately call your gas supplier.  

 

DO NOT DESTROY THIS MANUAL

 

Please read carefully and keep in a safe place for future reference. 

 

     
     

      

TABLE OF CONTENTS 

 

 

 

2

Summary of Contents for HO-225

Page 1: ...Products Commercial Installation Operator s Nov 99 Heating Furnace And Manual...

Page 2: ...ed furnace assembly Gas or oil burner 1 Heat exchanger combustion chamber and 1 Oil or gas burner and controls casing 1 Oil nozzle 1 Blower and pulley 1 Instruction manual and literature 1 Motor and p...

Page 3: ...Stack G C K Inspection Port onnector L Fiberglass Rope Seal H Heat hanger M Combustion Chamber D Radiator I Heat Exchanger Baffle N Refractory Lining E Radiator Baffle O Burner Port B Fan and Motor C...

Page 4: ...BTU HR 225 000 300 000 400 000 Input Gas BTU HR 245 000 375 000 500 000 Input Oil GPH 2 00 2 50 3 50 CFM 33 WC ESP 2400 3400 4800 Blower Motor HP 3 4 1 1 1 2 Stack Diameter in 9 10 12 NOTES 1 Gas bur...

Page 5: ...control listee s name and listed marking A bustible flooring only The safety control shall bear the contro Horizontal clearances be installed in an alcove with the following name listed markings and...

Page 6: ...l windows or louvers in a door to these rooms obtain sufficient air and to prev atmospheric air pressure in the room If there is a of combustion air the burner yellow and formation of soot will occur...

Page 7: ...ing it will be permissible to take CO2 over the fire which will be acceptable In this event both CO2 readings shall be recorded after 10 minutes of operation Readings During the period of operation to...

Page 8: ...Pump supplies fuel to nozzle Burner ignites Furnace blower activates at blower ON setting Area is heated and thermostat is satisfied Protector relay de energizes burner components Furnace blower cont...

Page 9: ...of draft GAS Every gas burner should be serviced at least once a year preferably at the beginning of the heating season moving thermostat 5 Make certain that fire burns cle OTE For complete burner ope...

Page 10: ...10...

Page 11: ...11...

Page 12: ...12...

Reviews: