16
15
INST
ALL
ATION
M
ain
tenanc
e
4. Place the bidet on the fixing bracket.
5. Connect the bidet hose (tubing) to the T-shaped connector and
the product’s inlet port.
6. Turn the lever on the T-shaped connector to open it.
7. Open the main water supply valve.
- Make sure to check in the T valve connection and the bidet’s inlet port
for any leakage after opening the water supply valve.
8. Insert 3 new AA batteries into the battery cartridge.
(see page 19)
9. Check if the main unit is ready to operate normally.
- If the Red LED indicator on the control panel blinks, contact your
COWAY service center.
Summary of Contents for BA35-A
Page 25: ...24 23 MEMO Others SPECIFICATIONS...
Page 26: ...MEMO...
Page 27: ...26 25 Others MEMO...