![Country Heart 2000 L Owner'S Operation And Instruction Manual Download Page 12](http://html.mh-extra.com/html/country-heart/2000-l/2000-l_owners-operation-and-instruction-manual_2673076012.webp)
12 Ussc
FACTORY BUILT CHIMNEY :
When a metal prefabricated chimney is used, the manufacturer’s installation instructions must be
followed. You must also purchase (from the same manufacturer) and install the ceiling support
package or wall pass-through and “T” section package, firestops (where needed), insulation shield,
roof flashing, chimney cap, etc. Maintain proper clearance to the structure as recommended by the
manufacturer. The chimney must be the required height above the roof or other obstructions for
safety and proper draft operation.
Summary of Contents for 2000 L
Page 22: ...22 Ussc NOTES ...
Page 23: ...Ussc 23 NOTES ...