
ChargePoint® Charging Stations
2-8
Step 7 - Mount pole assembly
Ensuring that all five wires are pulled
through the pole assembly, place the pole
assembly over the wiring conduit and
attach its base plate to the J-Bolts using
the installer-supplied nuts and washers, as
shown.
Adjust the nuts as necessary to ensure the
D-Stand’s mounting pole is level. When
level, tighten the nuts.
IMPORTANT:
Ensure the base
plate/pole assembly is level by adjusting
the nuts underneath the base plate.
Position a level
on the
mounting pole
Adjust these nuts
as necessary to
ensure the
mounting pole is
level