Hardware List
5
www.costway.com
www.costway.com
ASSEMBLY TOOLS REQUIRED ( NOT INCLUDED )
2
1
Wood dowel (8pcs)
3
Hex-Head bolts (44pcs)
4
Hex-Head bolts (8pcs)
5
6
Hex-Head bolts (6pcs)
Horizontal-Hole bolts(60pcs)
1/4"*15 (9.5mm)
8
9
Wood screws (74pcs)
10
11
Metal connector (4pcs)
Hex-Head bolts (8pcs)
Allen key (1pc)
(1/4")4.5*58mm
Hex-Head bolts (8pcs)
Wood dowel (10pcs)
7
13
12
Wheels (4pcs)
45*20*35 mm
Wheels (4pcs)
Wood screws (24pcs)
100*63*20mm
14
Metal bracket (4pcs)
Metal bracket (2pcs)
15
16
Wood screws (8pcs)
17
16
STEP 20:
5
8PCS
5
Remove Hex-Head bolts (5) the ladder (U&T), from
the Upper/Lower frame (E) out of the Bunk bed.
4PCS
10
10
Remove Upper Bunk Bed ,connecting bar (10) out of the Lower Bunk Bed.
STEP 21: