Page | 13 [email protected]
+1.818.937.0700 877.CAMERA.8 www.arecontvision.com [email protected]
Wall Mount
For a proper wall mount installation, the AV-WMJB wall mount and MD-CAP wall mount cap are
required (sold separately). A wall mount should only be attached onto hard ceilings including
wood, plastic, metal, and concrete.
1. Using the Mounting template, prepare the mounting provisions for the camera installation.
2. Connect wall mount cap and wall mount as shown in Figure 1.
Figure 1: Attach wall mount cap to the wall mount
NOTE: The thread size for Top shield, pendant pole and mount is 1.5” NPT.
3. Attach the wall mount to the wall using the four drywall screws provided or any optional
hardware suitable for the mounting surface.
4. Run the Ethernet Cable and outside power cable (if necessary) through the supplied rubber
gasket and then through the wall mount. Ensure the gasket is seated properly.
5. Attach the mounting plate to the MD-CAP with the supplied screws as shown in Figure 2.
Figure 2