-
Please
make sure
that the arrow is positioned on the same side as
the
appliance controls. Make 4, Ø
8
holes in the ceiling and drive in 3
screws without completely tightening them(Fig2). Pay attention not to
insert the screw into the hole marked with an
X
on the hole template (the
screws and expansion plugs must be suitable for the type of wall).
- Take the upper part of the structure
B
and insert the 3 slots onto the 3
screws that are not completely tightened. (Fig3)
Rotate slightly to fit.
Drive in the fourth screw
X
and tighten the remaining 3 to allow definitive
blocking of the upper part of structure
B.
-
Take the lower part of the telescopic structure
C
and insert it into
the
upper structure
B
.
-
Adjust the height (Fig.5) by referring to the amounts
calculated
in
the mathematical formula and
fix
the position
using the 8 unit screws
G
that are supplied (Fig.4)
-
Ducted option
:
fix the flexible
duct
to the air evacuation hole
that you
have prepared.
(Fig.6).
-
Take the upper chimney piece and fix it with 4 unit screws
G
.
(
Fig.7
)
-
Take the lower chimney and fix it with 2 unit screws
G
to hold its
position
.
(
Fig.8
)
-
Insert the suction unit inside the structure and set in 4 mounting
hole
s
,
drive in 4 unit screw
s
N.
(Fig.9).
-
Fix the air evacuation pipe
H
(not supplied) onto the connection
flange
(Fig.10)
-
Unscrew the 2 screws
G
and rest the lower chimney piece above
the
cooker hood (Fig.11).