Cosmic ACDC12 User And Installation Manual Download Page 23

ELECTRICAL WORK 

 

If you want to use the connector purchased by yourself, the following requirements must be complied:

 

 

Use only connector special designed for solar electric systems. 

 

Use the recommended or specified tools when install the connectors.

 

Do not unplug the connectors when the power is on. 

 

The connector suitable for the solar photovoltaic system can be obtained from the manufacturer. 

 

Electrical connection: 

 

 Completely cover the module with an opaque material during mechanical installation and electrical

 

 

Installation. 

 

 Protect the cables from being damaged. 

 

 Ground mounting must abide with all local regulations. 

 

 Storage battery can not be connected with the solar photovoltaic system. 

 

Grounding: 

 

The module frame must be properly grounded. The grounding wire must be properly fastened to

 

the module frame to assure good electrical contact. 

 

If the support frame is made of metal, the surface of the frame must be electroplated and have

 

excellent conductivity. The grounding wire must be properly fastened to the support frame .

 

There are two pre-drilled mounting holes in the frame, used to install the grounding cable. Each

 

module should connect with the grounding cable. 

 

We recommend the closed lug when grounding. First insert the ground cable into the jack of the

 

closed lug, then insert the stainless steel bolt (M3) into the tab of the lug, the grounding

 

hole on the frame and finally a nut to secure the entire assembly. The spring washer is required in

 

order to prevent screw loosening and cause improper grounding. 

 

The grounding resistance must be less than 10 ohms. 

 

Fig.58 

 

Junction box installation: 

 

All modules come with a permanently attached junction box and provide with fitted cables. 

 

The junction box is part of the panel itself, please contact the manufacturer if there is

 

  

any problem with the module. 

 

Disclaimer of liability 

 

Because the use of this manual and the conditions or methods of installation, operation, use 

 

and maintenance of photovoltaic (PV) product are beyond our control, we do not take any 

 

responsibility and expressly disclaims liability for loss, damage, or expense arising out of or in 

 

any way connected with such installation, operation, use or maintenance. No responsibility is 

 

assumed by us for any infringement of patents or other rights of third parties, which may resulted

 

by using the PV product. No license is granted by modification or otherwise under any patent or 

 

 

patent rights. The information in this manual is based 

on company’s knowledge and experience 

 

and is believed to be reliable; but such information including product specification (without 

 

limitations) and suggestions do not constitute a warranty, expressed or implied. We reserves

 

the right to change the manual, the PV product, the specifications, or product data sheets

 

without prior notice. 

 

22 

 

Summary of Contents for ACDC12

Page 1: ...installing air conditioners we recommend you hire a professional installer The person who installs the system must do all work in compliance with local building and electrical codes Are there any rest...

Page 2: ...helpful hints on how to install and test the air conditioner properly CAUTION Contact an authorized service technician for repair or maintenance of this unit Only allow a qualified person to install t...

Page 3: ...se installation instructions Use a dedicated circuit If electrical circuit capacity or electrical work is not proper it can cause electrical shock or fire 6 Use the specified cable and connect tightly...

Page 4: ...awning is built over the outdoor unit it must be done in a way that does not block air flow to the unit Keep the spaces indicated by arrows from wall or other obstacles Do not place animals and plants...

Page 5: ...tapping Screw B ST2 9X10 Optional 2 9 Remote controller holder parts 1 CAUTION Use a stud finder to locate studs to prevent unnecessary damage to the wall A minimum pipe run of 3 meters is required t...

Page 6: ...ng points on the installation plate The installation plate is different according to the models Dimensions are in mm unless otherwise stated Drill a hole in the wall 1 Determine hole positions accordi...

Page 7: ...Connection in REFRIGERANT PIPING CONNECTION Indoor unit installation 1 Pass the piping through the hole in the wall 2 Put the upper claw at the back of the indoor unit on the upper hook of the instal...

Page 8: ...tallation Install the outdoor unit on a rigid base to prevent increasing noise level and vibration Determine the air outlet direction where the discharged air is not blocked In the case that the insta...

Page 9: ...in joint Base pan hole of outdoor unit Refrigerant Tube Connection 1 Flaring work Main cause for refrigerant leakage is due to defect in the flaring work Carry out correct flaring work using the follo...

Page 10: ...essive torque can break the nut Electrical Work Fig 20 Electric safety regulations for the initial Installation 1 If there is an unsafe power supply the technician should refuse to install the air con...

Page 11: ...e panel Fig 23 Then lift it upward 3 Release the coupler plugs connected with the front display panel as shown in Fig 24 4 After taking down the front panel remove the electrical box cover by loosenin...

Page 12: ...bles to the terminals as identified with their respective locations see figure 27 3 Secure the cable onto the control board with the cord clamp 4 To prevent the ingress of water form a loop of the con...

Page 13: ...e place for future reference care and maintenance and in case of sale or disposal of the module at the end of its useful life General Installing solar photovoltaic systems may require specialized skil...

Page 14: ...llowing paragraph Do not attempt to disassemble the module and do not remove any attached nameplates or components Fig 30 Do not apply paint or adhesive to module top surface Do not use mirrors or oth...

Page 15: ...m the system while transporting and installing mechanical and electrical components Fig 34 Completely cover the module with a solid material like a blanket during installation to keep electricity from...

Page 16: ...e listed in the data sheet Data sheet values are values expected at standard test conditions Accordingly during system design values of short circuit current Isc and open circuit voltage Voc marked on...

Page 17: ...If additional wind or snow loads are considered for the installation additional mounting points are also used The support frame must be made of durable corrosion resistant and UV resistant material T...

Page 18: ...led to prevent leaks In some cases a special support frame may be necessary The roof installation of solar modules may affect the fireproofing of the house construction so it is necessary to use an ea...

Page 19: ...odule without using the pre drilled mounting holes in the frame please consult with the supplier Do not install in the rainy weather it may cause insulation failure due to moisture and there is a risk...

Page 20: ...e and the capacity of connector must be selected to suit the maximum system short circuit current otherwise the cable and the connector will be overheated under large current Modules connected in para...

Page 21: ...more than 30A The electrician must identify the positive pole and negative pole Reverse connection may cause permanent damage to the air conditioner Use qualified photovoltaic cables only The cable c...

Page 22: ...radius of the wire Fig 55 Do not unplug the connector when the power is on Fig 56 The protecting sheath must be used on the cable if there is a possibility for animals or children to touch it Fig 57 T...

Page 23: ...he stainless steel bolt M3 into the tab of the lug the grounding hole on the frame and finally a nut to secure the entire assembly The spring washer is required in order to prevent screw loosening and...

Page 24: ...9 The means for disconnection from a power supply shall be incorporated in the fixed wiring and have an air gap contact separation of at least 3mm in each active phase conductors Evacuation Air and mo...

Page 25: ...he vacuum pump to evacuate Check guage for proper vacuum After the evacuation is complete fully close the LOW valve of the manifold valve and stop the operation of the vacuum pump 5 Run evacuation for...

Page 26: ...tor to check for leakage CAUTION A Low valve B Hi valve C and D are for indoor unit connection Testing Indoor unit check point Cover Outdoor unit check point Fig 62 D C B A Perform test operation afte...

Reviews: