![Cosen SH-250R Instruction Manual Download Page 65](http://html1.mh-extra.com/html/cosen/sh-250r/sh-250r_instruction-manual_2670367065.webp)
8
‐
1
Section
8
MAINTENANCE &
SERVICE
INTRODUCTION
BASIC
MAINTENANCE
MAINTENANCE
SCHEDULE
BEFORE
BEGINNING
A
DAY’S
WORK
AFTER
ENDING
A
DAY’S
WORK
EVERY
MONTH
EVERY
THREE
MONTHS
EVERY
SIX
MONTHS
STORAGE
CONDITIONS
TERMINATING
THE
USE
OF
MACHINE
OIL
RECOMMENDATION
FOR
MAINTENANCE
INTRODUCTION
For
the
best
performance
and
longer
life
of
the
band
saw
machine,
a
maintenance
schedule
is
necessary.
Some
of
the
daily
maintenance
usually
takes
just
a
little
time
but
will
give
remarkable
results
for
the
efficient
and
proper
operation
of
cutting.
BASIC
MAINTENANCE
It
is
always
easy
and
takes
just
a
little
effort
to
do
the
basic
maintenance.
But
it
always
turns
out
to
be
a
very
essential
process
to
assure
the
long
life
and
efficient
operation
of
the
machine.
Most
of
the
basic
maintenance
requires
the
operator
to
perform
it
regularly.
Summary of Contents for SH-250R
Page 2: ......
Page 8: ......
Page 13: ...1 5 Illustration Emergency Stop Non CE model CE model Emergency Stop Emergency Stop ...
Page 17: ...1 9 Illustration Safety Labels ...
Page 22: ...2 4 FLOOR PLAN Machine top view Machine front view Machine side view ...
Page 32: ......
Page 50: ...5 2 Fig 5 1 Circuit Board and Power Supply Layout non CE model ...
Page 51: ...5 3 Fig 5 2 PLC Input Output Layout non CE model ...
Page 52: ...5 4 Fig 5 3 Control Panel Layout non CE model ...
Page 53: ...5 5 Fig 5 4 Power Supply Layout CE model ...
Page 54: ...5 6 Fig 5 5 Circuit Board Layout 1 CE model ...
Page 55: ...5 7 Fig 5 6 Circuit Board Layout 2 CE model ...
Page 56: ...5 8 Fig 5 7 Control Panel Layout CE model ...
Page 57: ...6 1 Section 6 HYDRAULIC SYSTEM HYDRAULIC CIRCUIT DIAGRAMS ...
Page 58: ...6 2 Fig 6 1 Hydraulic circuit layout ...
Page 64: ......
Page 76: ......
Page 95: ......