![coronaDesking GO2 WorkCenter Assembly Manual Download Page 3](http://html1.mh-extra.com/html/coronadesking/go2-workcenter/go2-workcenter_assembly-manual_2668963003.webp)
3
eisys/healthcare, inc.
corner 10.2010
3. ATTACHING THE TWO FRAMES
Remove the 6 T25 screws that secure the top of the frame cover
Remove the four screws and nuts indicated from Frame 2.
•
Remove the threaded pin as indicated from Frame 2.
•
Make sure all three (3) legs are at the exact same height before connecting the
drive shafts together.
•
Now connect the two drive shafts.