background image

003-813, Issue 3

STANDARD RECOMMENDED PROCEDURE 003-813 | ISSUE 3 | SEPTEMbER 2015 | PAGE 1 OF 8

Eclipse

®

 Rack-mountable 

1U and 2U Housing 
Hardware

Figure 1

1. 

Components

The main components of the hardware units are illustrated in Figure 2. Cable and patch cords can 
enter from either side of the housing.

Figure 2

TPA-4177

ECL-C1U

ECL-C2U

Cable Tie Locations

Radius Control Guides

Drawer Stop Plunger

(Lift to slide tray)

blank Adapter

Panels

Mounting bracket

Rear Hole for

Drawer Stop Plunger

KPA-2435

Summary of Contents for Eclipse ECL-C1U

Page 1: ...e 1 1 Components The main components of the hardware units are illustrated in Figure 2 Cable and patch cords can enter from either side of the housing Figure 2 TPA 4177 ECL C1U ECL C2U Cable Tie Locations Radius Control Guides Drawer Stop Plunger Lift to slide tray blank Adapter Panels Mounting bracket Rear Hole for Drawer Stop Plunger KPA 2435 ...

Page 2: ... holding the cover and lift the cover off the unit Figure 3 2 3 Mounting the Housing into a Rack Attach the unit to the equipment rack using the mounting brackets on each side Figure 2 and the four screws provided Two screws are required per side of the housing 2 4 Installing Jumper Trough Waterfall Step 1 Pull up on swell latches on the door and lower the door Install a waterfall on each side of ...

Page 3: ...om sharp bladed tools always cut away from yourself and others Dispose of used blades and armor scrap properly CAUTION Fiber optic cable is sensitive to excessive pulling bending and crushing forces Consult the cable specification sheet for the cable you are installing Do not bend the cable more sharply than the minimum recommended bend radius Do not apply more pulling force to the cable than spec...

Page 4: ...ckwise direction Step 4 Tighten the nut Step 5 Trim off the excess yarn and central member 2 7 Grounding Armored Cable If cable you are using is armored a grounding kit p n FDC CAbLE GRND purchased separately is required to ground each armored cable Follow the instructions provided with the grounding kit Step 1 Attach the other end of the ground wire to the equipment rack The equipment rack must b...

Page 5: ...contact flush eyes with water for at least 15 minutes Inhalation of vapors irritates the respiratory tract Exposure to high concentrations has a narcotic effect producing symptoms of dizziness drowsiness headache staggering unconsciousness and possibly death Step 1 Remove the blank panels from the unit and replace with connector panels purchased separately Step 2 Route the cable around the radius ...

Page 6: ...d splice tray to a work surface and splice feeder cable to pigtails as described in the instructions provided with the splice tray Step 4 Route feeder cable and pigtail slack around radius control guides and place splice tray on top of the guides Step 5 Secure the splice tray with hook and loop strap through the lances in the base and rear of the unit s drawer Step 6 Clean connectors and adapters ...

Page 7: ... in Figure 9 Step 5 Route pigtail slack around the radius control guides Step 6 Clean connectors and adapters per standard company practices and mate connectors in the adapters as shown in Figure 9 3 4 Installing Splitter Modules Step 1 Remove the radius control guides and the blank adapter panels Step 2 Install the splitter modules purchased separately in place of the blank panels Figure 10 Step ...

Page 8: ... NOTE Provide enough patch cord slack to allow the connector panel drawer to slide to the back and forward positions without violating the minimum bend radius of the patch cord Step 2 Install the provided identification ID label on the front door and record patch cord routing information Figure 11 5 Close the Housing Step 1 Lift drawer stop plunger and slide drawer toward the front of the housing ...

Reviews: