Minimum Conductor Size (csa)
TABLE 1-ELECTRICAL LOADING TABLE
INSTALL THE HEATER UNIT
HEATER UNIT INSTALLATION DIAGRAM
RAIL BRACKET COVER & CAP DISMANTLE STEPS
RAIL BRACKET
OPEN THE RAIL
BRACKET COVER
BY TURNING ANTI
CLOCKWISE & USING
SCREW DRIVER TO
OPEN THE CAP
RAIL BRACKET
COVER COME-OUT
1
2
3
RAIN SHOWER SET INSTALLATION PROCEDURES
G
65mm
255mm