Activate the pint portion. Check correct operation and ensure the product pipes are fully primed.
Check portions are correct using a marked container.
Commissioning UltraFlow font (see Operation)
Slide the gas connection through the cut out of
the sheet metal part and mount the casing
again. Connect the gas tank to the unit.
WARNING: Secure the gas tank with the chain
to ensure the tank can not fall down.
Connect the keg connection as shown with a
cleaning tank and clean the complete system
as described in “Sanitizing Product Coils”.
Afterwards connect product tank to the keg
connection.
Turn on the CO2 bottle and set the pressure
gauge to the required equilibrium pressure
+5 psi
Turn the switch at the beer monitor to release
the gathered foam into the overflow.
Summary of Contents for UltraFlow
Page 1: ......
Page 10: ......
Page 11: ......
Page 12: ...Parts replacement ...
Page 13: ......
Page 14: ...Technical data ...
Page 15: ...Wiring Schematic System Schematic ...
Page 17: ......
Page 18: ......
Page 28: ......