background image

TOP ROW
3/8’ - 5/8”
 DIMPLE

CENTER
1/8” BRIDGE

BOTTOM 2
ROWS
3/16” - 1/4”
BRIDGE

FIGURE 7. CUBE SEPARATION

12

630460070

Transformer

RD

Error

OFF

OFF

OFF

ON

ON

ON

SW4

SW4

SW4

5

6

YL

YL

YL

YL

S3–1

S3–2

OFF

ON

GR

Comp.

Micro Processor

4 Curtain Switch Connected To Any

Bin Connector (J4–J7) (FACTORY
SETTING AS RECEIVED)

Suction Line Sensor

Bridge thickness  pot.

Dump Cycle Dip Switch

Water Curtain
Dip Switch

S3–1

S3–2

On

Off

On

1  2  3

Off

Curtain
Selection
Switch

1

2

3

4

In

Out

Com

Stack

Bin

Switches

External Error LED

Connection

Triac

5 Curtain Switch Must Be Connected To

J4 and J5, J6, J7.

6 Curtain Switch Must Be Connected

To J4, J5, J6 and J7)

SINGLE CURTAIN

DUAL CURTAIN

FOUR CURTAIN

1

S3–1

OFF

ON

2

S3–1

OFF

ON

3

S3–1

OFF

ON

4

S3-1

S3-2

1

OFF

OFF Dump Every Harvest (FACTORY SETTING AS RECEIVED)

2

ON

OFF Dump Every Third Harvest

3

OFF

ON

Dump Every Seventh Harvest

S3–2

S3–2

S3–2

Condenser Sensor

Harvest Voltage Set point pins 2
and 3 Factory setting @ 1.224 V

GR

GR

GR

GR

Fan

Dump

Gear

Gas

Pump

FIGURE 6. DUMP CYCLE OPTIONS

ADJUSTING BRIDGE THICKNESS

For optimum ice production and maximum cube separation, the ice connecting the individual
cubes should be a minimum of 1/8” (.32 cm) thick at the center area of the ice waffle.

BRIDGE 1/8” (0.32 CM)

It is normal for the Ice Bridge to be slightly thicker at the bottom and taper off in a slight wedge
pattern at the top. The top row of cubes must have a complete pattern of ice on all four sides and
the back wall.

REMEMBER: When you operate the product with the panels off during testing the additional heat
at the top of the evaporator will cause thinner ice at the top than when the panels are in place.
Should a different thickness of the bridge be desired, it will be required to adjust the ice thickness
“POT”, located on the circuit board, as follows:

Summary of Contents for IACS224

Page 1: ...ctive by test Water pipe connections and fixtures directly connected to a potable water supply shall be sized installed and maintained according to Federal State and Local Codes PRINTED IN U S A IMI C...

Page 2: ...5 ELECTRICAL 7 INSTALLATION CHECK POINTS 7 START UP AND CHECK OUT 8 OWNER OPERATOR 9 CLEANING PROCEDURES 9 PREP CLEANING 9 CLEANING THE WATER SYSTEM AND EVAPORATOR 9 SANITIZING PROCEDURES 10 DUMP CYCL...

Page 3: ...Do not let anyone operate the machine without instructions Keep your machine in proper working condition Unauthorized modifications to the machine may impair function and or safety and affect the mac...

Page 4: ...2 630460070 THIS PAGE LEFT BLANK INTENTIONALLY...

Page 5: ...cartons for visible damage Open and inspect as required before the driver leaves and have him or her note any damage on the receipts All damaged claims must be inspected within 15 days of delivery Not...

Page 6: ...CULATION FAN MOTOR Water Cooled and Remote Systems only Volts 115 220 115 220 Phase 1 1 1 1 Hertz 60 50 60 50 Amps Running 1 4 1 4 36 17 Watts 35 35 6 5 WATER PUMP Volts 115 220 115 220 Phase 1 1 1 1...

Page 7: ...ct ever be exposed to freezing temperatures it must be shut down and winterized FIGURE 1 INSTALLATION AIR COOLED WATER COOLED SHUT OFF VALVE WATER FILTER BIN DRAIN TUBE ELECTRICAL CORD TO OUTLET DUMP...

Page 8: ...6 630460070 FIGURE 2 CUBER INSTALLATION...

Page 9: ...ls is affected causing pressure variations These pressure variations can result in low or a failed ice harvest 1 Has bin and cuber been leveled and sanitized 2 Does electrical and plumbing meet code r...

Page 10: ...evaporator cools to 25_F 3 9_ C Depress the manual harvest switch located on the circuit board The fan motor will stop and the water dump valve will open in 3 seconds the hot gas solenoid will open a...

Page 11: ...e in the storage bin or dispenser must be removed WARNING When using any chemical rubber gloves and eye protection should be worn PREP CLEANING Use full strength ice machine cleaner on a coarse surfac...

Page 12: ...ion common liquid laundry bleach to the water pan and allow the pump to circulate the solution for 5 minutes You may also use a commercial sanitizer such as Calgon Ice Machine Sanitizer following the...

Page 13: ...itch the pump will stop and the float will return the water level back to its original setting and shut off the wa ter supply 3 You have the option of selecting dump cycle intervals of S every cycle S...

Page 14: ...F Dump Every Third Harvest 3 OFF ON Dump Every Seventh Harvest S3 2 S3 2 S3 2 Condenser Sensor Harvest Voltage Set point pins 2 and 3 Factory setting 1 224 V GR GR GR GR Fan Dump Gear Gas Pump FIGURE...

Page 15: ...vest cycle As the ice harvest bar swings closed the ice machine returns into the freezing cycle FULL BIN CONTROL A bin thermostat is provided to control the level of the ice in the storage bin When th...

Page 16: ...er normal operating conditions Models IACS50 AC322 and WC322 are excluded from this warranty clause LIMITED LABOR WARRANTY PERIOD In addition to the parts warranty CORNELIUS will pay scheduled straigh...

Page 17: ...15 630460070 THIS PAGE LEFT BLANK INTENTIONALLY...

Page 18: ...One Cornelius Place Anoka Minnesota 55303 6234 Telephone 800 238 3600 Facsimile 763 422 3246 Corporate Headquarters IMI CORNELIUS INC...

Reviews: