Coremorrow N31 User Manual Download Page 7

5

N31 Installation diagram

Before installation, first check the safety, such as whether the cable is damaged or broken, 

and whether the power supply has grounding protection.

5.1 Installation and announcement

1. Ensure that the installation plane is relatively flat.

2. Fix the platform with M3 screws and tighten it.

3. Install load, properly tighten, load should not exceed 5kg.

N31 installation diagram is shown below:

5. Installation and Operation

Travel mechanism 

Fixed mounting

(M3)

Outlet

Load connection(M4)

Load connection(M2.5)

5.2 Load

When installing the load, ensure that the load mass is less than the max load of the N31, 

and install the load as much as possible at the center of the moving surface.           

The correct placement of the load is shown below:

Load applied to the center of piezo motor

Summary of Contents for N31

Page 1: ...N31 Linear Piezo Motor User Manual Version V1 0 This document describes the following products N31 25E N31 25K N31 50E N31 50K N31 100E N31 100K...

Page 2: ...inciple or under the guidance of a professional If the product is disassembled or modified without permission our company will not be responsible for any consequences arising therefrom It is illegal t...

Page 3: ...racteristics 4 3 2 Motion Direction 4 4 Operating Environment 4 5 Installation and Operation 5 5 1 Installation and announcement 5 5 2 Load 5 5 3 Operating 8 6 Transportation and Inspection 8 6 1 Tran...

Page 4: ...Symbol and meaning DANGER Improper handling may could cause injury to the operator Attention Improper handling can cause damage to the equipment No order between items 1 3 Expected reader The manual...

Page 5: ...xtension wire if need longer cable please contact us Temperature changed and pressure will charge the piezo motor Piezo motor will remain charged for a period of time disconnected from the controller...

Page 6: ...age between 0 and 120V for long term and high reliability operation Motion direction of N31 3 Product Overview 3 1 Characteristics Large blocking force Automatic zero position after power on Optional...

Page 7: ...ws and tighten it 3 Install load properly tighten load should not exceed 5kg N31 installation diagram is shown below 5 Installation and Operation Travel mechanism Fixed mounting M3 Outlet Load connect...

Page 8: ...nd the load is too high If it is used a higher load please reduce the position center of the load gravity The error placement method is as follows If the screws used in tightening and connecting are t...

Page 9: ...load when installing it and the torque should not be too large to avoid damage to mechanism Avoid stretching and bending cables Please connect N31 and controller with special cable provided by CoreMo...

Page 10: ...tely turn off the power and check parameter settings 6 1 Transportation Product is packed in carton The transportation is carried out under the condition of packaging This product can be transported b...

Page 11: ...ituation and contact with us The professional technical engineer would help solve the problem Problems caused by improper operation are not covered by the warranty CoreMorrow is not responsible for an...

Page 12: ...the products you are currently using please let us know the following information Product model number and related number Controller model for this product Software driver version for this product Co...

Reviews: