a:

 Ensure that the opening end of the panel is vertical and the panel is parallel with the opposite wall. Carefully 

measure the distance

 ‘X’ between the glass panel and the wall.

b: 

If required, trim the strut to length: 

X + 50mm

c: 

Push-fit the end cap onto the untrimmed end of the strut.

PAGE 2

2

Slide both seals down into the wall channel and 
cut off any excess. 
Note the orientation of the soft flippers.

Horizontal strut installation

SINGLE PANEL

1

Place the wall channel in position against the wall at the required distance from the opposite 
wall, as shown  (Horizontal strut installation - maximum of 980mm). 

a:

 Ensure the wall channel is vertical and mark the four holes onto the wall. 

b: 

Drill the four positions marked using a 6mm drill bit. 

c:

 Apply silicone sealant to the back of the wall channel

d: 

Insert the wall plugs. Place washers over the 32mm screws and fix the wall channel to the 

wall. If necessary, slight adjustment is available in the wall channel. 

b

a

c

5

Assemble the strut: slide on the panel bracket and wall bracket assembly. Lightly tighten the fitted 
grub screws. Carefully place the strut assembly onto the glass, approximately 100mm from the edge 
(depending on your installation). Ensure the strut is level and mark the position of the wall bracket 
assembly onto the wall.

 

IMPORTANT

Ensure Glass Guard H2o 
label is to the outside of 
the enclosure/panel
Satin glass patterns must 
be installed to the outside 
of the enclosure.
Note:
The Glass Guard coating is 
on the opposite side to the 
label or satin glass patterns

Carefully push the panel into the wall channel. 
Note: Wetting the edge of the panel with water will 
help the panel insert.

Strut 

PN10658

Wall channel 

PN10640

X

X  + 50mm

Untrimmed 

end of strut

Wall

Opening

=

=

Approx. 

100mm

PN80456

Options:

For Horizontal 

strut installation 

follow steps: 

4 - 8

For Vertical 

strut installation 

follow steps: 

9 - 15

ø 6

mm

a

b

d

32 

mm

 980mm max. -  

ONLY Horizontal 

strut installation

c

Summary of Contents for TUBULAR SHOWER PANELS

Page 1: ... check very carefully that components are vertical To avoid damage use the opened out packaging to build the enclosure on EQUIPMENT NEEDED Drill 6mm Masonry Bit 3mm Metal Bit general Crosshead Screwdriver Spirit Level Pencil Fine Tooth Saw Silicone Sealant Scissors Tape Measure Note The screws and wall plugs supplied are for masonry walls For lightweight walls i e stud partitions plasterboard etc ...

Page 2: ...ix the wall channel to the wall If necessary slight adjustment is available in the wall channel b a c 5 Assemble the strut slide on the panel bracket and wall bracket assembly Lightly tighten the fitted grub screws Carefully place the strut assembly onto the glass approximately 100mm from the edge depending on your installation Ensure the strut is level and mark the position of the wall bracket as...

Page 3: ...onto the glass panel with grub screws on the inside Screw the wall bracket cover onto the inner wall bracket f Tighten the wall bracket cover grub screw g From inside slide the glass clamp up between the bracket and glass panel tighten the grub screw 1 Ensure the panel is vertical and tighten the grub screw Push fit the top cap onto the top of the wall channel 9 Ensure that the opening end of the ...

Page 4: ...nsert the wall plug and fix the inner ceiling bracket to the ceiling using a 32mm screw and washer Note The opening in the inner ceiling bracket should be parallel with the end of the panel Note The screws and wall plugs supplied are for masonry walls For lightweight walls i e stud partitions plasterboard etc use the correct type of fixings 13 a Reposition the strut back onto the panel with grub s...

Page 5: ...on Max opening 800mm c IMPORTANT Ensure Glass Guard H2o label is to the outside of the enclosure panel Satin glass patterns must be installed to the outside of the enclosure Note The Glass Guard coating is on the opposite side to the label or satin glass patterns ONLY Horizontal strut installation 4 a Ensure that the opening end of the panel is vertical and the panel is parallel with the opposite ...

Page 6: ... the marked position and mark the fixing hole onto the wall b Drill the position marked using a 6mm drill bit 30mm deep c Insert the wall plug and fix the inner wall bracket to the wall using a 38mm screw and washer Note The screws and wall plugs supplied are for masonry walls For lightweight walls i e stud partitions plasterboard etc use the correct type of fixings d Slide the strut bracket and w...

Page 7: ...nels Outside 12 Ensure that the end of the second panel is vertical Carefully place the second panel bracket on to the glass approximately 100mm from the edge depending on your installation Carefully measure the distance Y between the wall bracket assembly and the panel bracket Y Position the strut into the wall bracket assembly and the panel bracket Ensure the panel is vertical and tighten the gr...

Page 8: ...tallation Ensure the strut is vertical and mark the position of the outer ceiling bracket onto the ceiling c Remove the strut assembly Drill a hole in the centre of the position marked using a 6mm drill bit 30mm deep d Insert the wall plug and fix the inner ceiling bracket to the ceiling using a 32mm screw and washer Note The opening in the inner ceiling bracket should be parallel with the end of ...

Page 9: ...ntact your local authority to find your nearest recycling centre 22 Place the second wall channel in position against the wall a Ensure the wall channel is vertical and mark the four holes onto the wall b Drill the four positions marked using a 6mm drill bit c Apply silicone sealant to the back of the wall channels d Insert the wall plugs Place washers over the 32mm screws and fix the wall channel...