![Copa eomix User And Installation Manual Download Page 32](http://html.mh-extra.com/html/copa/eomix/eomix_user-and-installation-manual_2665933032.webp)
COPA Eomix Wall Hung Gas Boiler User and Installation Manual
30
The trap cover should be filled
with water direetly or via boiler
flue outlet before usage.
Please check installation inlets if
there are
1-
CH inlet and outlet fer ¾ tab
and filter
2-
DHW inlet for ½ tab and filter
3-
Gas inlet for ¾ tab
1.5. Installation System
A condensing water with 3.1 pH
acidity valve in max capacity
occurs due to natural gas burning.
The accessory trap should be
connected to the drainage with a
suitable way.
The Scheme of Assembly
Plumbing
Drawing 1.5.1
The pump capacity should be
adjusted depending on the
overall pressure of installation to
degrease the noises on the
installations by the COPA
authorised services.
Drawing 1.5.2
The Product Connections
Pump Characteristic
of The Boiler
•
Drawing 1.5.2
Hot Water
Cold Water
Condensing Water
The Scheme of Connections
1-
Central heating system flow line (CH) ¾’’
2-
Domestic Heating Water flow line (
DHW) ½’’
3-
Gas inlet ¾’’
4-
Cold Water inlet line (DHW) ½’’
5-
Central Heating return line (CH) ¾’’
1
2
3
4
5
Summary of Contents for eomix
Page 1: ...eomix Kullanım ve Montaj Kılavuzu copa com tr ...
Page 25: ...eomix User s and Installation Manual copa com tr ...
Page 44: ......
Page 46: ......
Page 47: ......