![COOPS & FEATHERS 250-72 Assembly Instructions Download Page 3](http://html1.mh-extra.com/html/coops-and-feathers/250-72/250-72_assembly-instructions_2665703003.webp)
A
.
.
.
.
A
.
.
.
.
A
A
2
.
A
11
14
8
15
18
A
x4
O
R
A
A
.
.
A
x3
17
19
10
3
.
A
.
.
B
20
19
18
A
x1
B
x1
C
C
A
A
A
A
x3
C
x2
GET PARTS #18 FRONT RIGHT BOTTOM FRAME SUPPORT AND #8 CENTER BOTTOM FRAME SUPPORT.
SET #18 WITH TONGUE AND GROOVE SIDE TO THE RIGHT AND THE NOTCH ON LEFT SIDE FACING UP.
INSERT #8 TONGUE AND GROVE INTO SLOT ON BACKSIDE OF #18. SECURE WITH ONE SCREW #A.
A.
TAKE BUILT SECTION AND INSERT TONGUE AND GROVE END OF #18 INTO NOTCH ON #14 RIGHT
END BASE AND TONGUE AND GROOVE END OF #8 INTO #15. SECURE WITH TWO #A SCREWS INTO
THE OUTSIDE OF EACH END THROUGH PRE-DRILLED HOLES THAT HAVE BEEN INSERTED.
LOCATE PART #19 RIGHT FRONT CENTER SUPPORT AND ONE #10 CENTER TOP SUPPORT, INSERT
#10 TONGUE AND GROOVE END INTO #19 AND SECURE WITH ONE SCREW #A INTO OUTSIDE PRE-
DRILLED HOLE.
A.
TAKE BUILT SECTION AND INSERT TONGUE AND GROOVE END OF #19 AND INSERT INTO #3
AND THE OTHER TONGUE AND GROOVE END OF #10 INTO #17. SECURE WITH TWO SCREWS #A
INTO EACH END.
GET PART #20 RIGHT DECK FRAME AND INSERT THE TONGUE AND GROOVE BOTTOM INTO THE FAR-
LEFT NOTCHED TOP SECTION TOP OF #18. SECURE BACK OF #20 THROUGH PRE-DRILLED HOLE OF #19
WITH ONE SCREW #B IN BACK AND ONE #A SCREW THROUGH BOTTOM USING PRE-DRILLED HOLES.
A.
RIGHT SIDE IS COMPLETE FOR NOW AND YOU ARE GOING TO CONNECT TO THE LEFT!
ALIGN YOUR LEFT AND RIGHT SIDE AND MATCH THEM TOGETHER. YOU WILL SEE THE
THREE TONGUE AND GROOVE DECK SUPPORTS WILL INSERT INTO THE NOTCHES ON THE
FRONT AND THE BACK SECTIONS WILL ALIGN. WE SUGGEST USING YOUR CLAMP TO
SECURE THESE TOGETHER IN THE FRONT.
A.
SECURE THROUGH PRE-DRILLED HOLES ON RIGHT SIDE OF DECK WITH THREE #A
SCREWS.
B.
SECURE THROUGH PRE-DRILLED HOLES ON LEFT SIDE OF BACK CENTER SUPPORTS
WITH TWO #C SCREWS.
7
8
9
10