![COOPS & FEATHERS 250-72 Assembly Instructions Download Page 2](http://html1.mh-extra.com/html/coops-and-feathers/250-72/250-72_assembly-instructions_2665703002.webp)
A
.
.
A
A
.
.
.
.
.
.
.
.
.
A
7
8
2
1
A
x3
A
.
.
.
C
F
A
.
A
.
4
6
10
9
3
A
.
A
x4
B
A
A
A
.
.
.
.
.
13
13
12
11
9
7
A
x4
B
x1
B
A
A
A
A A
A
A
A
.
A
x8
.
.
.
.
.
.
B
x1
16
4
17
15
14
3
3
GET PARTS #7 FRONT LEFT BOTTOM FRAME SUPPORT & #8 CENTER BOTTOM FRAME
SUPPORT. SET #7 WITH TONGUE AND GROOVE SIDE TO THE LEFT AND THE NOTCH ON
RIGHT SIDE FACING UP. INSERT #8 TONGUE AND GROVE INTO SLOT ON BACKSIDE OF #7.
SECURE WITH ONE SCREW #A.
A.
TAKE BUILT SECTION AND INSERT TONGUE AND GROVE END OF #7 INTO NOTCH ON
#1 LEFT END BASE AND TONGUE AND GROOVE END OF #8 INTO #2 REAR LEFT END BASE.
SECURE WITH TWO #A SCREWS INTO THE OUTSIDE OF EACH END THROUGH PRE-
DRILLED HOLES THAT HAVE BEEN INSERTED.
LOCATE PART #9 LEFT FRONT CENTER SUPPORT AND ONE #10 CENTER TOP
SUPPORT, INSERT #10 TONGUE AND GROOVE END INTO #9 AND SECURE WITH
ONE SCREW #A INTO OUTSIDE PRE-DRILLED HOLE.
A.
TAKE BUILT SECTION AND INSERT TONGUE AND GROOVE END OF #9 AND
INSERT INTO #3 AND THE OTHER TONGUE AND GROOVE END OF #10 INTO #6.
SECURE WITH TWO SCREWS #A INTO EACH END.
GET PART #11 LEFT DECK FRAME AND INSERT THE TONGUE AND GROOVE BOTTOM
INTO THE FAR-RIGHT SECTION TOP OF #7. SECURE BACK OF #11 LEFT DECK SUPPORT
THROUGH PRE-DRILLED HOLE OF #9 WITH ONE SCREW #B.
A.
TAKE #12 FRONT DECK SUPPORT AND INSERT INTO NOTCHED FRONT TOP
SECTION WITH THE PRE-DRILLED HOLE FACING DOWN. SECURE WITH ONE SCREW
#A.
B.
GET #13 CENTER DECK SUPPORTS (TWO) AND INSERT EACH NOTCHED AREAS OF
#11 WITH ONE SCREW #A FOR EACH.
C.
LEFT SIDE IS COMPLETE FOR NOW. SET ASIDE AND GET READY FOR THE RIGHT!
PLACE #14 RIGHT END BASE WITH THE TWO NOTCHES CLOSER TO THE GROUND FLAT AND INSERT #15 BACK
RIGHT BASE (NOTCH FACING FORWARD AND CLOSE THE GROUND) INTO #1 WITH THE TONGUE AND GROVE
TOWARDS THE BACK. INSERT ONE #A SCREW THROUGH PRE-DRILLED HOLE AND SECURE.
A.
ALIGN ONE #3 UPPER FRAME SIDE ON THE BACKSIDE OF #2 AND SECURE WITH ONE #A SCREW. REPEAT
WITH SECOND #3 UPPER FRAME SIDE BEHIND THE CENTER NOTCH ON #1 AND SECURE WITH ONE #A SCREW
ON THE BACK AND ONE #A SCREW O THE SIDE.
B.
REST #4 TOP FRAME ON TOP OF #3 SUPPORTS AND SECURE ONE #A SCREWS ON EACH SIDE THROUGH TOP
PRE-DRILLED HOLES.
C.
SECURE #16 BACK RIGHT CENTER FRAME SUPPORT DOWN INTO NOTCHED AREA ON TOP FAR LEFT OF #15.
SECURE WITH ONE SCREW #A THROUGH PRE-DRILLED HOLE ON BOTTOM.
D.
TAKE #17 UPPER RIGHT REAR SUPPORT AND INSERT TONGUE/GROOVE END INTO #3 WITH NOTCH FACING
FORWARD ON RIGHT. SECURE #17 INTO #16 THROUGH THE PRE-DRILLED HOLE IN THE BACK USING ONE #B SCREW.
NEXT SECURE WITH ONE SCREW #A THROUGH THE PRE-DRILLED HOLE ON #3.
3
4
5
6