Cooper Metalux CGTS NUV Installation Instructions Manual Download Page 3

3

CGTS NUV Surface Mount Instructions

CGTS NUV Surface Mount Instructions

IB519158EN     www.cooperlighting.com

8.9

06

*

0.

9-

6

2

±0.

52

4

*609.8

569.8±2

A

A

4xR2.25

+1

0  

+1

  0

Figure 7. 

 

Figure 8. 

 

Figure 9. 

 

Figure 10. 

 

Installation Instructions

ote: 

N

It is the installer’s responsibility to create the 
required electrical supply prior to installing the 
mounting frames.

ote: 

N

The 2x2 Installation Diagram. The 1x4, 2x4 and 2x2 
installation method are the same.

Mark the hole position on the celing

Re-connect power & test

Remove end 

piece

Secure to ceiling

Masonary mounting

Ceiling

Wall plugs

Screws

Insert panel light & connect driver

Frame

Frame end piece

Reassemble frame

Step 1: 

Mark the mounting hole position on the ceiling, using 

the assembled frames as reference. (See Fig. 8.)

Step 2: 

Drill the holes according to the marks to suit 

mounting surface.

Step 3: 

For masonry mounting, insert the wall plugs into the 

holes.

Step 4: 

Secure the fully assembled frame onto the ceiling 

with screws.

Step 5: 

Remove one side of the fully assembled frame.

Step 6: 

Insert the LED panel light into the frame slot and 

connect the driver and power supply.

Step 7: 

Reassemble the end piece onto the frame.

Step 8: 

Connect power and confirm correct operation.

Figure 11. 

 

Figure 12. 

 

Summary of Contents for Metalux CGTS NUV

Page 1: ...ginal packing must be retained ote N Connect fixture to a 120 277V 347V 60Hz power supply Any other connection voids the warranty ote N This equipment has been tested and found to comply with the limi...

Page 2: ...30mm self tapping screws x 6pcs 6mm plastic capsules x 4pcs 6mm plastic capsules x 6pcs Baffle Plate B X 2PCS RAL9003 Baffle Plate B X 2PCS RAL9003 Baffle Plate A X 2PCS RAL9003 Baffle Plate A X 2PCS...

Page 3: ...iece Secure to ceiling Masonary mounting Ceiling Wall plugs Screws Insert panel light connect driver Frame Frame end piece Reassemble frame Step 1 Mark the mounting hole position on the ceiling using...

Page 4: ...s etc ATTENTION Service de r ception Veuillez fournir une description actuelle de tout manque ou de tout dommage receipt File claim for common carrier LTL directly with carrier Claims for concealed da...

Page 5: ...otaraudeuses 30 mm plastique 6 mm capsules x 4 plastique 6 mm capsules x 6 D flecteur B X 2 RAL9003 D flecteur B X 2 RAL9003 D flecteur A X 2 RAL9003 D flecteur A X 2 RAL9003 Trousse de montage en sur...

Page 6: ...un mur en ma onnerie Plafond Prises murales Vis Ins rez le panneau d clairage et connectez le pilote Cadre Embout du cadre Remontez le cadre tape 1 Marquez la position du trou de montage sur le plafon...

Page 7: ...isibles al momento de su entrega Presente el reclamo directamente al transportista de carga LTL Los reclamos por da os ocultos deben presentarse dentro de los 15 d as posteriores a la entrega del prod...

Page 8: ...ecuados para paneles de 1 x 4 ft 30 48 cm x 1 21 m Plano dimensional Kits de montaje en superficie adecuados para paneles de 2 x 4 ft 60 96 cm x 1 21 m Plano dimensional Unidad mm Unidad mm Unidad mm...

Page 9: ...marco Vuelva a ensamblar el marco Paso 1 marque la posici n del orificio de montaje en el techo utilizando los marcos ensamblados como referencia vea la Fig 8 Paso 2 taladre los orificios de acuerdo c...

Page 10: ...This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Ope...

Reviews: