Cooper Power Systems

7

CT-Y0-0398

!

SAFETY

FOR LIFE

Summary of Contents for LCR 6200

Page 1: ...sent through the SelectComm and ZigBee communication modules No special test equipment or programming is required to install the LCR 6200 in the field The LCR 6200 addressing must be configured for your demand response system prior to operation CAUTION Observe precautions for handling electrostatic sensitive devices MISE EN GARDE Respectez les précautions de manipulation des dispositifs à décharge...

Page 2: ...ated throughout the document SAFETY FOR LIFE SAFETY FOR LIFE Hazard Statement Definitions This document may contain four types of hazard statements DANGER Indicates a hazardous situation which if not avoided will result in death or serious injury WARNING Indicates a hazardous situation which if not avoided could result in death or serious injury CAUTION Indicates a hazardous situation which if not...

Page 3: ...the wiring within a 1 2 liquid tight non metallic flexible conduit or make sure the wiring is close nippled into an approved junction box or wiring compartment All wiring connections are made to factory installed leads that are rated for 600 VAC 105 C No polarity requirements apply to the output leads 4 Locate and record the LCR address Install Code EUI 64 address and any other necessary informati...

Page 4: ...he LCR receiver board for more than five seconds to instruct the ZigBee module to join the ZigBee network NOTE The commissioning process may take up to five minutes to complete When the commissioning process is complete the LCR Status LCD turns on solid and the ZigBee status of the LCR changes to Commissioned in the Yukon software LCR 6200 LEDs The LCR 6200 LEDs have the following meanings Load St...

Page 5: ...to increment the control time by the configurable period of time For example if the configurable period of time is set to 30 seconds push the Test button four times to control for two minutes The relay control initiated by the Test button is implemented as a standard timed load control command zero delay and zero random extension This overrides any other currently implemented or delayed control Wh...

Page 6: ...12 1 IEC 61000 4 2 Surge Withstand Capability Oscillatory 6 kV 100 kHz waveform per ANSI C12 1 IEEE C62 41 Fast Transient 6 kV 1 2x50 μs 8x20 μs waveform per ANSI C12 1 IEEE C62 41 Wire Size Limits This energy management device is designed tested and certified to UL Standard 916 which contains allowances for field wiring system conductor sizing It is intended to be connected directly to the equipm...

Page 7: ...Cooper Power Systems 7 CT Y0 0398 SAFETY FOR LIFE ...

Page 8: ...scriptions or safety notations LCR 6200 Load Control Receiver FCC COMPLIANCE STATEMENT This device complies with Part 15 of the FCC Rules Operation is subject to the following two conditions 1 This device may not cause harmful interference and 2 This device must accept any interference received including interference that may cause undesired operation This equipment has been tested and found to co...

Reviews: