Cooper Power Systems VXE Control Installation And Operation Instructions Manual Download Page 8

Battery Replacement

Although both the control and lockout target batteries are
designed to last for ten years under normal duty, it is rec-
ommended that they be replaced every six years. This
corresponds to the maximum recommended interval for
vacuum recloser maintenance. The control battery
should also be replaced if the total accumulated time
without CT power reaches 100 days; however, the con-
trol battery life is reduced to half (50 days) with SCADA.
The control battery life is independent of the number of
trip or close operations of the recloser.

Programming the Control
Settings

The control must be programmed with all necessary oper-
ating settings prior to operation with an energized reclos-
er. Changes in the control operating parameters should
only be made by a qualified technician or engineer.

The DIP switches for programing the control are located
on the lefthand side of the control cabinet as shown in
Figure 4.

Sequence Coordination

Sequence Coordination prevents unnecessary operation
of the backup recloser for a fault beyond a downline
recloser by advancing the control sequence one step
when line current exceeds the programmed minimum trip
value for a time duration shorter than the programmed
control response time. This maintains trip coordination
with a downline recloser while protecting fuses from tem-
porary faults.

Sequence Coordination is always active for the number
of TCC1 operations selected for the VXE control. For
example, for two trip operations on TCC1 and two trip
operations on TCC2, Sequence Coordination will
advance to TCC2 for the third trip operation of the down-
line recloser, maintaining trip coordination.

Minimum-Trip Value

The minimum-trip current rating for phase overcurrent is
established by positioning DIP switches (labeled S1) in
the control (Figure 5). The minimum-trip setting of the
recloser can be changed by merely changing the DIP
switch setting.

Minimum-trip level can be programmed from 10 through
1280 A, in 10 A increments. The programmed value
equals the sum of the values of the switches in the On
position plus 10 A.

To avoid inadvertent tripping of the recloser when chang-
ing minimum-trip settings on an energized recloser, 

all

the S1 switches must be set to the ON position first

. Turn

off the necessary switches to obtain the desired minimum
trip value.

Type VXE Single-Phase Electronically Controlled Recloser Installation and Operation Instructions

8

Figure 5.
Programming DIP switches.

921119KM-2

CAUTION:

Equipment misoperation. Do not

energize this equipment until all control settings

have been properly programmed and verified. Refer to
the Control Programming and Operation section of this
manual for programming procedures. Failure to comply
can result in misoperation (unintended operation),
equipment damage, and personal injury.

G118.1

!

Summary of Contents for VXE Control

Page 1: ...rogramming and Operation 7 Type VXE Electronic Control 7 Programming the Control Settings 8 Specifications and Ratings 10 Dimensions 11 Installation Procedure 12 Placing the Recloser In Service 13 Ope...

Page 2: ...ting main taining or testing this equipment carefully read and understand the contents of this manual Improper operation handling or maintenance can result in death severe personal injury and equipmen...

Page 3: ...ss is discov ered file a claim with the carrier immediately Check for oil leakage and tighten all bolts that may have loosened during shipment especially the tank mounting bolts Tank mounting bolts sh...

Page 4: ...voltage closing is sup plied through a 2 pin connector mounted on the recloser head Closing Solenoid Operation The closing operation is illustrated by considering the recloser to be connected to the l...

Page 5: ...ion the lever is pulled from under the sleet hood to its down position as shown in Figure 2 The lever must be manually returned to the up position in order to return the recloser to its pre programmed...

Page 6: ...eration section of this manual for further information The VXE control can be equipped with an optional SCADA input output board to provide remote operation and status functions for SCADA applications...

Page 7: ...pening actuator In addition a control battery is required to supply power to the control during the reclose intevals If line current drops below 3 A or the recloser is in the open position power is th...

Page 8: ...le protecting fuses from tem porary faults Sequence Coordination is always active for the number of TCC1 operations selected for the VXE control For example for two trip operations on TCC1 and two tri...

Page 9: ...TCC2 Time Current Curve Modifiers The DIP switches labeled S6 Figure 5 are used to mod ify the shape of the time current curve produced by the TCC plug in card for TCC1 and or TCC2 Each TCC plug in ca...

Page 10: ...imate inches 0 4 0 5 Contact Close Time Close Signal To Contact Make seconds 0 19 0 24 Open Contact Travel Time Open Signal To Contact Part seconds 0 014 0 022 Interrupting Time Open Signal to Arc Ext...

Page 11: ...Pole Bolt Connector NO 6 350 MCM 16 UNC 2B 8 5 Figure 6 Dimensions of Types VXE15 and VXE27 reclosers Type Bushing Type A B C VXE15 standard 1156 45 5 483 19 270 10 5 VXE15 extra creepage 1237 48 75 5...

Page 12: ...ug as shown in Figure 4 Make sure that all DIP switch settings are set correctly and that the control cable is connected between the recloser and control 6 Mount the recloser Use the lifting lug locat...

Page 13: ...en placing the recloser in service Be sure that the control battery is properly connected When the recloser is connected and source side high voltage lines are energized by closing the source side dis...

Page 14: ...dle down and returning the yellow handle to its up Closed position If the VXE con trol is equipped with the optional SCADA input output accessory board the recloser can be remotely closed from lockout...

Page 15: ...n the 600 5 tap 3 Ammeter Must have a rating based on the level of test current Since the control is responsive to peak current it is recommended that metering responsive to peak current be used when...

Page 16: ...the pipe plug in the head casting before placing the recloser in service High Potential Insulation Level Withstand Tests High potential withstand tests provide information on the dielectric condition...

Page 17: ...when the recloser trips and compare to the VXE control s pro grammed minimum trip value Sequence of Operation Test The operating sequence can be checked by using the manual closing tool to close the r...

Page 18: ...ating correct operation of the clos ing solenoid Type VXE Single Phase Electronically Controlled Recloser Installation and Operation Instructions 18 Figure 13 Suggested test diagram for high voltage c...

Page 19: ...SCADA I O board also includes dry contacts to provide remote status information All remote features are accessed through a 19 pin recep tacle Type MS 22 14 female mounted on the bottom of the control...

Page 20: ...Department offers recloser mainte nance training classes These classes taught by experi enced service technicians are held at the factory s in house training facility For additional information contac...

Reviews: